ML19291B921
| ML19291B921 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/07/1979 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19291B922 | List: |
| References | |
| NUDOCS 7912140364 | |
| Download: ML19291B921 (1) | |
Text
.
I L.;.7...,...
,,. n.. h ! i li L*.
r.
L...
' L i '.g:..
J
.5 :
J t, _ C t
.,~.t,..
ILLUMINATING BLDC. e PU8UC SoVARE e CLEVELANo. oHlo 44101 e TELEPHONE (216) 6231350 m MAIL ADDRESS: P.o. Box 5000 g
Dalwyn R. Davidson viCE sessiCENT sv5ttu tsamtsamo ano constauction December 7, 1979 Mr. James G. Keppler Director of Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Final Report on S & M Constructors, Inc.'s Quality Assurance Program Breakdown Regarding Control of S & M Subcontractor:
The Halvorsen Boiler and Engineering Company
Dear Mr. Keppler:
Pursuant to the Interim Report of February 12, 1979, please find attached the Final Report on S & M Constructors, Inc.'s Quality Assurance Program breakdown regarding control of S & M Constructors, Inc.'s subcontractor:
The Halvorsen Boiler and Engineering Company.
The attached Final Report includes a description of the deficiency, an analysis of the safety, implications, and the corrective action taken, as required by 10CFR50.55(e).
As a result of this Final Report, the condition described herein is no longer considered a Significant Deficiency.
Very truly yours,
/
J D. R. Davidson Vice President System Engineering and Construction ksz Attachment cc: Victor Stello, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.