ML19291B921

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re QA Program Breakdown
ML19291B921
Person / Time
Site: Perry  
Issue date: 12/07/1979
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19291B922 List:
References
NUDOCS 7912140364
Download: ML19291B921 (1)


Text

.

I L.;.7...,...

,,. n.. h ! i li L*.

r.

L...

' L i '.g:..

J

.5 :

J t, _ C t

.,~.t,..

ILLUMINATING BLDC. e PU8UC SoVARE e CLEVELANo. oHlo 44101 e TELEPHONE (216) 6231350 m MAIL ADDRESS: P.o. Box 5000 g

Dalwyn R. Davidson viCE sessiCENT sv5ttu tsamtsamo ano constauction December 7, 1979 Mr. James G. Keppler Director of Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Final Report on S & M Constructors, Inc.'s Quality Assurance Program Breakdown Regarding Control of S & M Subcontractor:

The Halvorsen Boiler and Engineering Company

Dear Mr. Keppler:

Pursuant to the Interim Report of February 12, 1979, please find attached the Final Report on S & M Constructors, Inc.'s Quality Assurance Program breakdown regarding control of S & M Constructors, Inc.'s subcontractor:

The Halvorsen Boiler and Engineering Company.

The attached Final Report includes a description of the deficiency, an analysis of the safety, implications, and the corrective action taken, as required by 10CFR50.55(e).

As a result of this Final Report, the condition described herein is no longer considered a Significant Deficiency.

Very truly yours,

/

J D. R. Davidson Vice President System Engineering and Construction ksz Attachment cc: Victor Stello, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 1582 203 pon s

llI 7 912140 3M