ML19291B921

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re QA Program Breakdown
ML19291B921
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/07/1979
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19291B922 List:
References
NUDOCS 7912140364
Download: ML19291B921 (1)


Text

. .

' L i

'.g:..

J t, _ C t

.,~.t,..

I L .;.7.

J .5..: ,..

. r .

, ,. .n. . h ! i li L*. L... "

g ILLUMINATING BLDC. e PU8UC SoVARE e CLEVELANo. oHlo 44101 e TELEPHONE (216) 6231350 m MAIL ADDRESS: P.o. Box 5000 Dalwyn R. Davidson viCE sessiCENT sv5ttu tsamtsamo ano constauction December 7, 1979 Mr. James G. Keppler .

Director of Region III Office of Inspection and Enforcement .

U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Final Report on S & M Constructors, Inc.'s Quality Assurance Program Breakdown Regarding Control of S & M Subcontractor:

The Halvorsen Boiler and Engineering Company

Dear Mr. Keppler:

Pursuant to the Interim Report of February 12, 1979, please find attached the Final Report on S & M Constructors, Inc.'s Quality Assurance Program breakdown regarding control of S & M Constructors, Inc.'s subcontractor:

The Halvorsen Boiler and Engineering Company. ,

The attached Final Report includes a description of the deficiency, an analysis of the safety, implications, and the corrective action taken, as required by 10CFR50.55(e).

As a result of this Final Report, the condition described herein is no longer considered a Significant Deficiency.

Very truly yours, ,

/ #

J D. R. Davidson Vice President System Engineering and Construction ksz Attachment -