Discusses 791029 Power Reactor Licensee Notification Methods in Place for Estimating High Level Gaseous Released from Plants During Accidents
ML19291B804
Person / Time
Issue date: 11/01/1979
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Ahearne J
NRC COMMISSION (OCM)
Shared Package
ML19291B805 List:
References
NUDOCS 7911130107
Download: ML19291B804 (1)


Text

i, h,

.s.-

y -.

DISTRIBUTION:

+-eee-T Central Files G. Knighton D. Muller 5

EEB Reading L. Barrett F. Schroeder

'O '

)

=

NRR Reading J. Donohew D. Vassallo i

H. Denton PDR M. Groff EDO LPDR (NRR3264)

L. Gossick E. Case C. Phillips x

MEMORANDUM FOR:

Comissioner Ahearne

.h,'

b "h

er ell FROM:

H. R. Denton, Director, Office of Nuclear Reactor Regulation

{

THRU:

Executive Director for Operations unear T. A. *

~

SUBJECT:

IMPLEMENTATION OF HIGH RANGE EFFLUENT MONITORS AT OPERATING

~

REACTORS Your memorandum (attached) requested that power reactor licensees be notified of the requirement to have methods of quantifying high level accidental radio-activity releases by January 1,1980. This has been done.

=

As discussed in the September 6th Commissioner's meeting, the licensees have been required to have methods in place for estimating high level gaseous re-leases of radioactivity from plants during accidents by January 1,1980, and to have pemanent high range gaseous effluent monitors installed by January 1, h

1931. These requirements were listed in Enclosure 8, "Near Tem Emergency k

Preparedness Improvements Schedule," item 2.2.1.8(b), of the September 13th Z..

letter and specifically referred to by D. G. Eisenhut in his opening state-ments at each regional meeting for TMI Short-Tem Implementation Action. Ad-

.T ditionally, this topic was discussed technically at.each regional meeting (see Z

attached viewgraph). Our October 29, 1979, letter to power reactors providing additional clarification of the short-term Lessons Learned items also addressed

. 5 F

this issue. Therefore, the recipients of the September 13th letter have been C

notifid of our requirements.

yy.-r;.m jE iDx H. R. Denton, Director Office of Nuclear Reactor Regulation 1.

Memorandum dated September 20, E..

1979, from John Ahearne to Harold Denton f_

2.

Viewgraph entitled " Interim

===c Procedures for Quantifying High Level Accidental Radio-Ac 00R D/NRR ED0

-;b Activity Releases (2.1.8.b)"

D t

HDenton x:

cc: Chaiman Hendrie 10 @ /79 10/

/79 10/ /79 r

remiceinne Gilinckv

.,,,.. do mitssioner Ker nedy EB R

EEB/ DOR f

/

s/ M comissicur Bn u m u,""-

ew T--.

~

" DOR

,..'..e. r,,,,

on ev-*== 4E Y...............

,x.

O m.a9 10a.

9...

...g L.....

.10./zo..a9.-

10asn9... 7

mc m au na, m uncx o2 +

,, c.,

7g),.

70,,,30

,