ML19291B635
| ML19291B635 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/29/1976 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19291B633 | List: |
| References | |
| GQL-1622, NUDOCS 7911110041 | |
| Download: ML19291B635 (2) | |
Text
j
- o,/
hM2
/
'=
nu m manu i
METROPOLITAN EDISON COMPAhv :vss:cisar of se:ssaat =ustic uri:.iries ccarcaer:cri i.
POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 GQL 1622 November 29, 1976 4
l
~
Mr. Eldon J. Brunner, Chief Reactor Operations & Nuclear Support Branch U. S. Nuclear Regulatory Co= mission 631 Park Avenue j
King of Prussia, Pennsylvania 19406
Dear Mr. Brunner:
Docket No. 50-289 O
Operator License No. DPR-50 Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Inspection Report No. 50-289/76-2h This letter and the attached enclosure are in response to your inspection letter of November 5,1976, concerning Mr. A. Fasano's inspection of TMI-1 and the resultant findings of deficiency "A".
Sincerely, f
R. C. Arnold l
Vice President 4
i i
RCA:DGM:rk Enclosure l
1532 234 v
79111100$(
3
f~
~
~
r s
i.
i O
r Metropolitan Edison Ccmpany Three Mile Island Nuclear Station Unit 1 Docket No. 50-289 License No. DPR-50 l
Inspection No. 76-2h DEFIC E CY A General Office Review Board (GORB) meeting No. 2h was conducted with j
alternates not duly appointed according to Technical Specifications j
6.5 2.3 3 This item requires that alternate members of the GORB be appointed in writing by the chair =an or vice-chair =an to serve on a te=porary basis.
~
RESPONSE TO DEFICIENCY A GORB chairman, Mr. J. R. Thorpe, has initiated two separate ways to f
insure the meeting vill cc= ply in the future with Technical Specification 6.5 2.B.3 2
h
- 1) A list of alternates for each member is being developed to assure a quorum vill be present.
- 2) If additional alternates are needed, they vill be designated in advance in writing.
We vill be in compliance prior to the next meeting and these steps should ensure future ec=pliance.
i lJ02 20D
---