ML19291B421
| ML19291B421 | |
| Person / Time | |
|---|---|
| Issue date: | 10/25/1979 |
| From: | Mcpherson G, Sullivan H NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| To: | Agee L, Bixby W, Griffith P ELECTRIC POWER RESEARCH INSTITUTE, ENERGY, DEPT. OF, MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE |
| References | |
| NUDOCS 7911080004 | |
| Download: ML19291B421 (5) | |
Text
.
UNITED STATES NUCLEAR REGULATORY COMMISSION E. I. @, ' *
- 3%
WASHINGTON. D. C. 20555
{W)y,-l}#
C 5
October 25, 1979
\\$'.'2'..o Those on Attached List Gentlemen:
Subject:
Joint Semiscale and LOFT Review Group Meeting Agenda Revision The Review Group Meeting agenda transmitted to you on October 19, 1979 has been revised with the meeting ending at 12:30 p.m. on Friday, November 2, 1979. The revised agenda is attached. The meeting location is still in Room P110 of the Phillips Building, 7920 Norfolk Avenue, Bethesda, Maryland.
Sincerely, h
G. D. McPherson, Chief LOFT Research Branch Division of Reactor Safety Research W
H. Sullivan, Chief Separate Effects Branch Division of Reactor Safety Research Attachment.
An stated 7'010 261 7 9110 8 0 do 4-
Addressees - l etter Dated October 25, 1979 L. Agee, EPRI M. Akimoto, EG&G Idaho H. Bailey, B&W S. Banerjee, McMaster Univ.
R. W. Barber, DSE, DOE-HQ R. G. Bearden, EG&G Idaho C. H. Berlinger, NRR, NRC W. Binner, IfR, AUSTRIA W. W. Bixby, DOE J. Block, CREARE K. J. Brinkman, ECN, NETHERLANDS G. F. Brockett, ITI W. Burchill, CE I. Catton, ACRS P. Y. Chen, NRR, NRC C. B. Davis, EG&G Idaho R. DiSalvo, PAS P. J. Docherty, b[
D. Eisenhut, NRR, NRC S. Fabic, RES. NRC R. Fraley, ACRS (3 cys)
P. Griffith, MIT S. Hanauer, NRR, NRC G. Holahan, NRR, NRC M. D. Houston, NRR, NRC Y. Y. Hsu, RES, NRC W. V. Johnston, RES, NRC W. Kato, BNL N. C. Kaufman, EG&G Idaho S. Kellerman, W S. T. Kelppe, EG&G Idaho N. N. Kondic, RES, NRC R. T. Lahey, RPI R. R. Landry, RES, NRC N. Lauben, NRR, NRC L. P. Leach, EG&G Idaho D. Lummerzheim, FRG G. Markoczy, SFIfFR, SWITZERLAND F. Mayinger, LulfV, GERMANY M. Meerbaum, B&W G. Menzel, CE C. Moser, EI T. E. Murley, RES, NRC H. Nakamura, JAERI, JAPAN P. E. Norian, NRR, NRC P. North, EG&G Idaho
?'.10 262 l
T. M. Novak, NRR, NRC
Addressees - Letter Dated October 25, 1979 F. Odar, NRR, NRC A. Olsen, RISO, DENMARK D. J. Olson, EG&G Idaho G. F. Owsley, EXXON K. Parczewski, NRR, NRC D. Ross, NRR, NRC Z. R. Rosztoczy, NRR, NRC S. Z. Rouhani, EG&G Idaho P. J. Schally, EG&G Idaho N. H. Shah, B&W B. Sheron, NRR, NRC M. Shiba, JAERI, JAPAN J. E. Solecki, D0E-ID P. O. Strom, RES, NRC-ID T. M. Su, NRR, NRC T. Sudoh, EG&G Idaho L. H. Sullivan, RES, NRC K. H. Sun, EPRI L. S. Tong, RES, NRC G. H. Weimann, EG&G Idaho J. D. White, ORNL K. R. Wichman, NRR, NRC L. Winters, EG&G Idaho L. J. Ybarrondo, EG&G Idaho Public Document Room (2 cys)
?n10 263
LOFT /SEMISCALE REVIEW GROUP MEETING AGENDA Thursday, hs. ember 1,1979 Time Subject Presenter 8:30 Introduction G. D. McPherson/H. Sullivan 9:00 Semiscale Results 1.
Introduction (10 minutes)
D. J. Olson 2.
Boiloff Tests 3.
Natural Circulation Tests 4.
Small Break Results to Date (1:00)
G. W. Johnsen 5.
Upper Head Drain Tests 6.
Nozzle Calibration Results 10:10 Break 10:25 Semiscale Scaling Analysis T. K. Larson 11:25 LOFT L3-0 Results D. B. Jarrell 12:00 Lunch 1:00 LOFT L2-2 and L2-3 RIL Summary G. D. McPherson 1:30 Comment on RIL Review Group 2:30 Discussion of LOFT and Semiscale G. D. McPherson/H. Sullivan Results 3:30 Application of LOFT Information to S. A. Naff LPWR Operations 4:00 Fault Diagnostic Computer
- 0. R. Meyer 4:30 Instrument Calibration W. J. Quapp 5:00 Adjourn O'n10 264
LOFT /SEMISCALE REVIEW GROUP MEETING AGENDA (Continued)
Friday, November 2,1979 Presenter Time Subject 8:30 Definition of Pumps-On/ Pumps-Off Z. Rosztoczy Problem 9:00 LOFT Pumps-On/ Pumps-Off Test Plans W. C. Phoenix 0:30 Other LOFT Small Break Plans W. C. Phoenix 10:00 Break 10:15 Semiscale Future Work G. W. Johnsen 11:00 LOFT Future Work /L6 Series P. A. Harris 11:45 L3-1 Pretest Predictions K. G. Condie 12:30 Adjourn
?010 265