ML19291B075
| ML19291B075 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 08/02/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19291B063 | List: |
| References | |
| NUDOCS 7908290303 | |
| Download: ML19291B075 (2) | |
Text
l '\\l\\
1 e
'(,
..v.
i.
tl t
j 7590-01 l
3 a
UN TED STATES NUCLEAR REGJLATORY' C9MMISSION D M ET DS. 50-282 AND 50-306 r
r NORll'ERN 1TATES POWER COMPANY,
s/
NOTICE OF ISSUANCE OF AMENDMENT TO I ACRIT" 3 p a
0 PIRATING LICENSE 2
. 1 i
jhe U. S. Nuclear Regylato'ry Conmission (the Conmission} has s
Ahm(ed Ahevime,f No.!17 td Facility Operating License q.. DPR-4'i,
.n s
and Amendiaent tio.,' 31 to Faci ity Operating License No. DPR-60 issue.1
\\
s' tc Northern States Power Company (the licensee), which revised Tech-nical' Specificabom for operation of Prairie Island Nuclear Generating
.s
'l ' Plant, Unit Nos. I and'2 (the facilities) 'hcated fn' Good?rce' r.ounty,
)
~l i
9.
Minnesota. The amendments are effective as,0f thy date of issuan:
The amendments change the surveillance friquencies b the nocleae instrumentation system low power level reactor trip j unctio.w f
s The application for the amendments complies yith the standeds i
and requirements of the Atomic Energy Act of 1954, as aminded (the Act), and the Commission's reies and papelations. The Commission has 1
made appropriate f.-indings as 'nquired(by the Act and the Commission's j,
rules and regulathns in 10 CF9. Chapter ], which are set forth in t
the liceme 6mendments.
Pri,nr public notice of these amendments was s
+
not required sinc $ thei amendnients do not involve a significant hazards i
consideration.
g s
/
2013 140 908290303 7
7590-01 The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR Sl.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need net be prepared in connection with issuance of these amendments.
For further details with respect to this action, see (1) the application for amendments dated January 10, 1978, suppi.iented March 15, 1979, (2) Amendment Nos. 37 and 31 to License Nos. DPR-42 and DPR-60, and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document Roem,1717 H Street, N.W., Vashington, D.C. and at the Environmentu.
onservation Library, 300 Ni c,llet Mall, Minneapolis, Minnesota 55401.
A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention: Director, Division of Operating Reactors.
Dated at Bethesda, Maryland, this 2nd day of August,1979.
FOR THE NUCLEAR REGULATORY COMMISSION
($
w A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors
].0 \\ b