April 19, 1979 Rev. April 27, 1979 BUCKEYE STEEL CASTINGS COMPANY 10CFR71 QA PROGRAM FOR INDUSTRIAL RADIOGRAPHY 1.

Organization The final responsibility for the Quality Assurance Program for Part 71 Requirements rests with Buckeye Steel Castings Company.

Design and fabrication of radioactive material shipping packages shall not be conducted under this Quality Assurance Program. The Quality Assurance Program is implemented using the following organization which is attached.

The Radiation Safety Officer is responsible for overall administra-tion of the program, training and certification, document control, and auditing.

The Radiographer is responsible for handling, storing, shipping, inspection, test, operating status and record keeping.

2.

Quality Assurance Program The management of Buckew Steel Castings Company establishes and implements this Quality -wsurance Program. Training for all QA functions, prior to engagement in these functions, is required according to written procedures. QA Program revisions will be made acccrding to written procedures with management approval.

The QA Program will ensure that all defined QC procedures, engineering procedures, and specific provisions of the package design approval are satisfied. The QA Program will emphasize control of the characteristics of the package which are critical to safety.

The Radiation Safety Officer shall assure that all radioactive material shipping packages are designed and manufactured under a Quality Assurance Program approved by the Nuclear Regulatory Commission for all packages designed or fabricated after January 1, 1979.

This requirement will be satisfied by receiving a certification to this effect from Tech / Ops, Burlington, Massachusetts prior to shipment.

3.

Document Control All documents related to a specific shipping package will be controlled through the use of written procedures.

All document changes will be performed according to written procedures approved by management.

IN@d5 1.

79052407/[

4 Handling Storage and Shipping (A)

Radiation Safety Officer and radiography personnel shall perform the critical handling, storage, and shipping operations.

(B)

Written safety procedures concerning the handling, storage and shipping of packages for certain special form radioactive material will be folicwed.

Shipments will not be made unless all tests, certif cations, acceptances, and final inspections have been completed. Work instructions will be provided for handling, storage, and shipping operations.

5.

Inspection, Test ana Operating Status (A)

Radiogrrchy personnel shall perform the regulatory required inspections and tests in accordance with written procedures.

The Radiation Safety Officer shall ensure that these functions are performed.

(8)

Inspection, test, and operating status of packages for certain special form radioactive material will be indicated and controlled by written procedures. Status will be indicated by tag, label, marking, or log entry.

Status of nonconforming parts or packages will be positively maintained by written procedures.

6.

Quality Assurance Records Records of package approvals (including references and drawings),

inspections, tests, operating logs, audit results, personnel training and qualifications and records of shipments will be maintained. Descriptions of equipment and written procedures will also be maintained.

These records will be maintained in accordance with written procedures.

The records will be identifiable and retrievable.

A list of these records,with their storage locations, will be maintained by the Radiation Safety Officer.

7.

Audits Established schedules of audits of the Quality Assurance Program will be performed using written checklists. Results of audits will be maintained and reported to management. Audit reports will be evaluated and deficient areas corrected.

The audits will be dependent on the safety significance of the activity being audited, but each activity will be audited at least once per year.

Audit reports will be maintained as part of the quality assurance records.

Members of the audit team shall have no responsibility in the activity being audited.

, a

/

le lk c-u 1. - ----

t O. F. Kraner, Director Quality Control and Assurance 2.

32,635

BUCKEYE STEEL CASTINGS DIVISION 1/1/79 President &

Gener al Manager J. T. HUGHES Accounting R.R. - Industrial Manufacturing Technology /

Military Sales New Products Controller Vice President Vice President Vice President W. L. BOWN W.D.REUTER W. C. BU FFINGTON W. R. RADC LIFF Production &

Engineering &

Manufacturing Quality Control Materiel Control Mass Transit Sales Engineering

& Assurance Director Di rector Vice President Director R. L. Kt. i i ELL J. R. DOWN ES P. K. KENNEDY J. F. KRAN ER Vice President Buckeye Steel Personnel &

Manufacturing Plant ind. Relations Manager Director E. W. GANSLEIN F.F.SNELL P.G.BORDAN p

N BUCKEYE STEEL CASTINGS DIVISION cn BUCKEYE INTERNATIONAL, INC.

7-18-78 BUCKEYE STEEL CASTINGS Rev 9-5-78 Rev. 10-23-78 QUALITY CONTROL Director Quality Control and Assurance J.

F.

KRANER Manager Manager Servtce mngineer Service Engineer Quality Control Technical Services Railroad Industrial Foundrv K.

STRAUS8AUGH D.

L.

CLARK G.

LEONHARDT Senior Welding Manager Manager - N. D. T.

Manager Engineer Quality Control Radiation Safety Quality Assurance Finishino Officer J.

PURDY D.

A.

SANDERS D.

SEITZ J.

BACK Chief Inspector Chief Inspector Chief Inspector Chief Inspector

,A Coupler Bolster & Frame Manufacturing industrial b

D.

SPARKS J.

FALCON D.

PIERPOINT H.

DAVIS W