ML19290G690
| ML19290G690 | |
| Person / Time | |
|---|---|
| Site: | 07002609, 07002885 |
| Issue date: | 12/03/1980 |
| From: | Hind J, Madeda T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19290G687 | List: |
| References | |
| 70-2609-80-02, 70-2609-80-2, 70-2885-80-02, 70-2885-80-2, NUDOCS 8012180365 | |
| Download: ML19290G690 (1) | |
Text
I@
U.S. NUCLEAR REGULATORY C0!!!!ISSION OFFICE OF INSPECTION AND ENFORCEtIENT REGION III Reports No. 70-2609/80-02; 70-2885/80-02 Safeguards Group IV Docket. Nos. 70-2609; 70-2885 Licenses No. SN!!-1802; SN?l-1833 Licensee:
Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:
LaSalle County Nuclear Station, Units 1 and 2 Inspection At:
LaSalle Site, !!a rs e il les, Illinois Inspection Conduct.ed:
November 17-20, 1980 Date of Last Physical Security Inspection:
June 24, 1980 Type of Inspection: Unannounced Physical Security Inspector: _Q 1 ceArg
_\\
_TV T.OJ. !!adeda d h.^
Date Physical Security Specialist Y
J
_.*t. C
- g h J ib__
Approved By:
A. Hind, Chief Dat Safeguards Branch &
I_nspection Summary Inspection on November 17-20 1980 (Reports No. 70-2609/80-02; 70-2885/80-02 1
Areas Inspected:
Included a review of the licensee's Security Plan, Security Organization, Physical Barriers, Access Controls, Communications, Response, Records and Reports, Followup on Previous Items of Noncompliance and Indepen-dent Inspection Ef fort.
The inspection involved 33 inspector hours onsite by one NRC inspector. The inspection began during day shift period; six inspect. ion hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirement.s within the areas examined during this inspection except for the following one item:
Physical lurriers:
(Access Controlled Area) - A physical barrier was found to be degraded.
(Infraction)
(Details Part 2.790(d) Information) 801:218o3 6 5