ML19290F877
| ML19290F877 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe, Monticello |
| Issue date: | 04/14/1978 |
| From: | Grimes B Office of Nuclear Reactor Regulation |
| To: | YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML19290F878 | List: |
| References | |
| TASK-09-01, TASK-9-1, TASK-RR NUDOCS 8011110334 | |
| Download: ML19290F877 (1) | |
Text
t 3
0 O
DcM n
,.f
,'o UNITED STATES
.(
NUCLEAR REGULATORY COMMisslON
(--
$}f y
g
- e
- c WASHINGTON, D. C. 20555
- e. % 1 i
/
.e April 14, 1978 4-To All Power Reactor Licensees y
Gentlemen:
Enclosed for your infomation and possible future use is the NRC
- J guidance on spent fuel pool modifications, entitled " Review and Acceptance of Spent Fuel Storage and Handling Applications". This e
document provides (1) additional guidance for the type and extent of information needed by the NRC Staff to perfom the review of licensee proposed modifications of an operating reactor spent fuel storage pool and (2) the acceptance criteria to be used by the NRC Staff in authorizing such modifications. This includes the information needed to make the findings called for by the Commission in the Federal Register Notice dated September 16, 1975 (copy enclosed) with regard to authorization of fuel pool modifications prior to the completion of the Generic Environmental Impact Statement, " Handling and Storage of Spent Fuel from Light Water Nuclear Power Reactors".
1 The overall design objectives of a fuel storage facility at a reactor complex are governed by various Regulatory Guides, the Standard Review Plan (NUREG-75/087), and various industry standards. This
.=
guidance provides a compilation in a single document of the pei.:nent a
portions of these applicable references that are needed in addressing 1
spent fuel pool modifications. No additional regulatory requirements a,
are imposed or implied by this document.
i{
3:
Based on a review of license applications to date requesting authorization
-?
to increase spent fuel storage capacity, the staff has had to request 3*
additional infomation that could have been included in an adequately documented initial submittal.
If in the future you find it necessary 3
to apply for authorization to modify onsite spent fuel storage 9
capacity, the enclosed guidance provides the necessary infomation 7
and acceptance criteria utilized by the NRC staff in evaluating these applications.
Providing the information needed to evaluate the q
matters covered by this document would likely avoid the necessity for NRC questions and thus significantly shorten the time required to process a fuel pool modification amendment.
~
. Sincerely, t
x
]
W h
Brian K. Grimes, Assistan Director I
for Engineering and P j cts 4
Division of Operating
..a tors j
Enciosures:
C 1,
NRC Guidance i