ML19290F024
ML19290F024 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 03/05/1980 |
From: | Randy Hall BROOKHAVEN NATIONAL LABORATORY |
To: | Ferguson R Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8003170466 | |
Download: ML19290F024 (2) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20138H3831999-10-25025 October 1999
[Table view]Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217M9991999-10-22022 October 1999
[Table view]Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J6591999-06-16016 June 1999 Submits Proposed Alternative to Requirements of 10CFR50.55a(g)(4) (Automatic Compliance with Latest Approved Edition of ASME Code Every 120 Months).Proposal Will Apply Third ten-year ISI Interval,Scheduled to Begin 990701 ML20207F0201999-06-0101 June 1999 Forwards Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2, for NRC Review.Plan Satisfies Commitment Contained in Licensee to NRC 05000317/LER-1999-002, Requests That Cover Page for LER 99-002,dtd 990525,be Corrected to Indicate Rept Is Submitted Per Requirements of 10CFR20.2201(b)1999-05-28028 May 1999 Requests That Cover Page for LER 99-002,dtd 990525,be Corrected to Indicate Rept Is Submitted Per Requirements of 10CFR20.2201(b) ML20195B2521999-05-25025 May 1999 Submits Response to RAI Re LAR for Tube Repair Using Leak Limiting Alloy 800 Sleeves for Ccnpp,Units 1 & 2.Test Repts Encl ML20195B3751999-05-25025 May 1999 Forwards ECCS Codes & Methods Rept, as Required by 10CFR50.46(a)(3)(ii) ML20195B2271999-05-24024 May 1999 Forwards Certified Copy of Nuclear Liability Policy NF-216, Endorsement 128 ML20206U3051999-05-19019 May 1999 Submits Written Rept as Required follow-up to Verbal Rept Given to NRC Regional Administrator on 990419 of SG Tube Insps Conducted,Cause of Tube Degradation & Corrective Measures Taken as Result of Insp Findings ML20206U8281999-05-18018 May 1999 Forwards Missing Pages C-30,C-31,C-114 & C-115 from 990319 Response to NRC RAI, Wind Tunnel Modeling of Calvert Cliffs NPP Cpp Project 94-1040. Complete Copy of 1985 Rept, Wind Flows & Dispersion Conditions of Calvert Cliffs, Encl ML20212G9751999-05-12012 May 1999 Forwards Draft write-up Re OI 16 for F Grubelich to Consider ML20206K6921999-05-10010 May 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsements,In Compliance with 10CFR140.15(e).Without Encl ML20206K1711999-05-0707 May 1999 Informs That on 990430 Util Filed Encl Articles of Share Exchange with Maryland Dept of Assessments & Taxation to Form Holding Company,Constellation Energy Group,Inc (Ceg). CEG Is Parent Company of Bg&E ML20206C7521999-04-29029 April 1999 Provides Rept of Number of Tubes Plugged in Calvert Cliffs Unit 2 SGs During Recently Completed Isi,As Required by Calvert Cliffs Unit 1,TS 5.6.9.a ML20206C7271999-04-28028 April 1999 Forwards Occupational Radiation Exposure Repts for 1998, as Required by Units 1 & 2 Tech Specs 5.6.1 & 6.1 of Isfsi. Repts Contain Tabulation of Number of Station,Util & Other Personnel Receiving Exposures Greater than 100 Mrem ML20212G9891999-04-28028 April 1999 Forwards Current Draft Response to Ci 3.3.2.2-1 to Be Used as Example for OI Vs License Condition Vs Commitment Situation ML20206C7211999-04-27027 April 1999 Forwards Addl Info Which Is Being Made Available in Encl Licensed Operators Fitness for Duty Questionnaire.Encl Specifics of Personal Info Are Withheld,Per 10CFR2.790 ML20212G9851999-04-26026 April 1999 Provides Proposed Response to OI 4.1.3-1 for B Elliott to Consider ML20206U6691999-04-26026 April 1999 Advises That Documents Re Operation of Calvert Cliffs Nuclear Power Plant Should Be Addressed to Listed Natl Marine Fisheries Svc Office ML20205F8851999-04-0202 April 1999 Provides First Annual Amend to Bg&E License Renewal Application for Ccnpp,Units 1 & 2,as Required by 10CFR54 ML20205J0691999-04-0202 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20205G2971999-04-0101 April 1999 Requests That NRC Complete Review of Rev 0 to CENPD-396-P, Common Qualified Platform TR & Rev 0 to CE-CES-195-P, Software Program Manual for 'Common Q' Sys, by 990930 ML20205D7471999-03-30030 March 1999 Forwards Biennial Rept on Status of Decommissioning Funding, IAW 10CFR50.75(f)(1) ML20207G4391999-03-30030 March 1999 Responds to from Cl Miller,Requesting Assistance of FEMA in Addressing Concerns Received by NRC Involving Offsite Emergency Preparedness at Plant NPP ML20205C4091999-03-26026 March 1999 Submits Info Related to Scope,Risk Mgt & Summary of Risk for Performing Preventive Maintenance on P-13000-2 Unit Transformer Re License Amend 205 1999-09-28 Category:RESEARCH INSTITUTION/LABORATORY TO NRC MONTHYEARML20212M8381986-08-29029 August 1986
[Table view]Forwards Interfacing Sys LOCA at PWRs Tasks 1B & 2B, Draft Ltr Rept ML20128C0111985-05-31031 May 1985 Forwards Final Draft NUREG/CR-4265, Assessment of Safety Implications of Control at Calvert Cliffs-1 Nuclear Plant, & Apps for Review & Comment.Final Rept Will Be Issued 850930.SJ Ball to Util Encl ML20097F1741984-08-27027 August 1984 Forwards Draft Apps D & E to Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant ML20097F9841984-08-22022 August 1984 Forwards Draft Chapter 6, Pressurized Thermal Shock Integrated Risk for Calvert Cliffs Unit 1 & Potential Mitigation Measures, of Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant ML20095C9831984-07-30030 July 1984 Forwards ORNL Draft Chapter 5:Probabilistic Fracture- Mechanics Analysis of Calvert Cliffs Unit 1 Sequences, of Pressurized Thermal Shock Rept.Comments Requested by 840822 ML20084A2761984-03-27027 March 1984 Forwards Viewgraphs Entitled, Calvert Cliffs-1 Overcooling Sequence P,T,H Estimation - Current Status ML20084A3191984-03-19019 March 1984 Forwards Draft, Evaluation of Effects of Calvert Cliffs Nuclear Power Station Electric Power,Compressed Air & Cooling Water Sys Failures on Pressurized Thermal Shock Event Sequences ML20069C3581982-03-30030 March 1982 Submits Control Room Habitability Evaluation Per NUREG-0660, NUREG-0578,NUREG-0737,Item III.D.3.4,SRP & General Design Criteria 4,5 & 19.Sys Will Provide Safe & Habitable Conditions Under Normal & LOCA Conditions ML19305E3651980-04-14014 April 1980 Forwards Input for Fire Protection Review,Item 3.2.2 Re Emergency Lighting.Recommends NRC Approval of Licensee Proposals Contained in 791113 Ltr. Submits Recommendations Re Proposal to Change from 1.5-h Units to 8-h Units ML19290F0241980-03-0505 March 1980 Forwards Addl Info in Response to Safety Evaluation Item 3.1.13,describing Addl Emergency Communication Sys. Recommends Documentation of Separation of sound-powered Wiring & plant-paging Sys ML19344D2131980-03-0404 March 1980 Forwards Items 3.2.1 & 3.2.10 of Fire Protection Review, Re Fire Hazard Analysis & Fire Water Drainage,Respectively ML19296D9781980-02-29029 February 1980 Forwards Fire Protection Review for Items 3.2.4,ventilation Duct Penetrations & 3.2.5/3.2.6,electrical & Piping Penetration Fire Resistance for Facility ML19294B7021980-02-26026 February 1980 Forwards Fire Protection Review of Items 3.2.2 & 3.2.3 Re Adequacy of Detector Installation & Fire Pump Flow Tests, Respectively ML19296C7981980-02-21021 February 1980 Forwards Input to Item 3.2.5,backflow Protection & Item 3.2.11,control Air of Facility Fire Protection Review ML19294B1441980-02-20020 February 1980 Forwards Fire Protection Review of Item 3.2.9 Re Effects of Fire on Radiation Monitors ML19296C8021980-02-20020 February 1980 Forwards BNL Input to Design Review Items Re Fire Protection Review.Bnl Will Review Item 3.2.1 Re Fire Hazard Analysis on 800226 in Bethesda,Md & Will Complete Item 3.2 on Schedule ML19296A9271980-02-12012 February 1980 Forwards Comments on Fire Test Procedure for Cable & Pipe Penetrations.Recommends Verification That Max Pressure Differential Across Penetration Seal During Fire Will Not Affect Performance ML19270G9991979-06-0505 June 1979 Comments on Fire Protection Safety Evaluation. Recommendations of Consultants Are Adequadely Reflected. Proposed Fire Protection Will Give Reasonable Assurance That Health & Safety of Public Will Not Be Endangered 1986-08-29 |
Text
.
l 2; ; ; i BROOKHAVEN NATIONAL LABORATORY
,r, , , ,
" ASSOCIATED UNIVERSITIES, INC.
~
L,; ue j
Upton. New York 11973 Department of Nuc!ect Energy (516) 345- 2144 March 5, 1980 Mr. Robert L. Ferguson Plant Systems Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Calvert Cliffs, Fire Protection Review, Item 3.1.13
Dear Bob:
The attached additional information on item 3.1.13, Emergency Communi-cation, has been requested by Mr. Tim Lee.
This is the final Brookhaven National Laboratory input for the Calvert Cliffs plant at this time.
Respectfully yours,
/?r s.r Robert E. Hall, Group Leader Reactor Engineering Analysis REH:EAM:sd attachment cc.: W. Kato wo/att.
T. Lee M. Levine wo/att E. MacDougall V. Panciera t
1 8 0 0 3 1 7 4) g
CALVERT CLIFFS Fire Protection Review Item 3.1.13 - Emergency Communication (additional information)
The SER states that communication equipment will be provided which is capable of maintaining communication between the control room and all areas of the plant, including the interior of containment, considering possible damage due to a single fire.
The licensee responded on November 13, 1979 stating an additional communica-tion system will be provided which will be capable of maintaining communica-tions between the centrol room and all areas of the plant including the con-tainment. They further statea that adequate separation between the new system and the existing systems will be provided so that a single fire at any loca-tion cannot disable both systems. On a later submittal (January 11, 1980) the licensee described the proposed new system and enclosed sketches that showed the proposed layout.
The new system provides an adequate extension of the existing sound powered system so that the containment, containment stairways and turbine building are better covered for communications. The containment penetration route shown on the sketch is satisfactory. However, the rest of the routing is not shown; we recommend that the separation of the sound powered wiring and the plant paging system be documented by the licensee and reviewed by the staff.
In. addition, the licensee has not addressed the possibility of a fire des-troying the cabinet in the control room and the conduits from the control room that are common to both the sound powered and the standard page/ party systems.
We recommend that the staff keep this as an open item until the conditions of the SER are met.