ML19290E982
| ML19290E982 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/11/1980 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003170417 | |
| Download: ML19290E982 (2) | |
Text
&
Georgia Power Company 230 Peachtree Street Post Omco Box 4545 At!anta, Georgia 30302 Telephone 404 522-6060 m
Power Generation Department March 11, 1980 Georgia Power U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation ATTN: Director of Regulation Washington, D. C.
20555 NRC DOCKETS 50-321 AND 50-366 EDWIN I. HATCH NUCLEAR PLANTS UNITS 1 AND 2 ACKNOWLEDGEMENT OF RECEIPT OF SECURITY PLAN REVISION 3/80 Gentlemen:
Georgia Power Company transnitted five copies of the March 1980 revision to the Plant Hatch Physical Security Plan to your office by letter dated March 7, 1980. We request that you acknowledge receipt of this revision by completing and returning the attached form.
Thank you for your attention in this matter.
Sincerely, d.' I cc m L. T. Gucwa EEB/mj Enclosure
\\
\\
8003170 7
yg
GEORGIA POWER COMPANY EDWIN I.
HATCH NUCLEAR PLANT PHYSICAL SECURITY PLAN TRANSMITTAL AND RECEIPT bNAME 17.9. Nncio,r pngn1,enry en-,4=einn DATE March 7, 1980 Office of Nuclear Reactor Regulation SECURITY PLAN # 1,2,3,4,5 REV7SION #
3/80 lEPQRIAEl EgllqE RECIPIENTS OF THE HNP PHYSICAL SECURITY PLAN MUST NOT SHOW OR RELEASE ITS CONTENTS FOR PURPOSES OTHER THAN OFFICIAL REVIEW AND COMMENT.
THE PHYSICAL SECURITY PLAN MUST BE STRICTLY CONTROLLED AND SHOULD BE MAINTAINED IN A LOCKED OR CONTROLLED AREA.
I ACKNOWLEDGE RECEIFT OF THE PHYSICAL SECURITY PLAN PFVISICM AS LISTED ABOVE AND CERTIFY THAT THE OBSOLETE PAG'jS, TABLES, AND/OR FIGURES HAVE BEEN PROPERLY DESTROYED.
SIGNATURF OF INDIVIDUAL DATE RETURN RECEIPT TO:
L.
T. GUCWA GEORGIA POWER COMPANY 230 PEACHTREE STREET., 16TH FLOOR P.
O. Box 4545 ATLANTA, GEORGIA 30302 11/4/79
.