ML19290E951

From kanterella
Jump to navigation Jump to search
Forwards LER 80-025/03L-0
Date released: 10/31/2019 Download: ML19290E951


LER 80-025/03L-0:on 800215,channel III Steamline Pressure Protection Bistable for P2 Greater than P1 Safety Injection Initiation Tripped at Unacceptable Setpoint.Caused by Setpoint Drift in Signal Comparator Card Circuitry
ML19290E953
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/14/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E953 (2)
Forwards LER 80-025/03L-0
ML19290E950
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/14/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19290E950 (1)