ML19290E761

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-375/80-01 on 800109 & Notices of Violation & Deviation.Insp Rept & Notices Withheld (Ref 10CFR2.790)
ML19290E761
Person / Time
Site: 05000375
Issue date: 02/15/1980
From: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rosalyn Jones
ROCKWELL INTERNATIONAL CORP.
References
NUDOCS 8003170004
Download: ML19290E761 (2)


See also: IR 05000375/1980001

Text

..

an arco

o

UNITED STATES

g

! '

. ,,7

g

AUCLEAR REGULATORY COMMISSION

"

g.

.c

REGION V

o,

[

1990 N. CALIFORNI A BOULEVARD

% ,% # [

SUITE 202, WALNUT CREEK PLAZA

  • ,,*

WALNUT CREE K. CALIFORNIA 94596

FEB 15 g6

Docket No. 50-375

Energy Systems Group

Rockwell International

8900 De Soto Avenue

Canoga Park, California 91304

A ttention: Mr. R. G. Jones

Vice President and Controller

Gentlemen:

Subject: NRC Inspection

This letter refers to the inspection of your activities authorized under NRC

License No. R-118 conducted oy Messrs. L. W. Ivey and W. P. Mortensen of this

office on January 9,1980.

It also refers to the discussion of our inspec-

tion findings held by the inspectors with R. Jones, M. E. Remley and members

of their staffs on January 10-11, 1980.

The inspection included examination of activities related to physical protec-

tion against industrial sabotage and against theft of special nuclear mater-

ial in accordance with applicable requirements of Title 10, Code of Federal

Regulations, Part 73, " Physical Protection of Plants and Materials," your

security plan, and license conditions pertaining to physical prctection as

described in the enclosed inspection report. Within thase areas, the inspec-

tion consisted of selective examinations of procedures and records, inter-

views with facility personnel and observations by the inspectors.

Based on the results of this inspection, it appears that one of your activ-

ities was not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

The item of non-

compliance is categorized into the level as described in our correspondence

to you dated fecember 31, 1974.

_

800317000b

i

-

,

,

,

.

Energy Systems Group

-2-

FEa 1, g,g

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within 20 days of your

receipt of this notice, a written statement of explanation in reply, including:

(1) steps which have been or will be taken by you to correct the violation, and

the results achieved; (2) steps which will be taken to avoid further viola-

tions; and (3) the date when full compliance will be achieved.

During this inspection it was also found that certain of your activities appeared

to deviate from Generally Accepted Industry Practices as set forth in the Notice of

Deviation, enclosed herewith as Appendix B.

In your reply please include your

coments concerning these items, a description of any steps that have been

or will be taken to prevent recurrence, and the date all corrective actions

or preventive measures were or will be completed.

In accordance with Section 2.790(d) of the NRC " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, documentation of the findings of your

safeguards and security measures are exempt from public disclosure; therefore,

the enclosed inspection report will not be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to dis-

cuss them with you.

Sincerely ,

/

LeRo

R. florderhaug, Chief

Safeguards Branch

'

Enclosures:

1.

Inspection Report

flo. 50-375/80-01 (IE-V-359)

2.

Appendix A - f!otice of Violation

3.

Appendix B - Notice of Deviation

cc w/ enclosures:

Mr. M. E. Remley