ML19290E557
| ML19290E557 | |
| Person / Time | |
|---|---|
| Issue date: | 01/28/1980 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Curnane R UNITED ENGINEERS & CONSTRUCTORS, INC. |
| Shared Package | |
| ML19290E544 | List: |
| References | |
| REF-QA-99900510 NUDOCS 8003140204 | |
| Download: ML19290E557 (2) | |
Text
c' I
[f acg.
o, UNITED STATES fj y Y ; c. t,' i NUCLEAR REGULATORY COMMISSION REGION IV y'A.
f - [
611 RYAN PLAZA DRIVE, SUITE 1000
~ ((
S, ARLINGTON, TEXAS 76012 28 JAN 1980 Docket No. 99900510/79-04 United Engineers & Constructors, Inc.
Attn:
Mr. R. A. Curnane, Vice President Project Support Operations 30 South 17th Street Philadelphia, Pennsylvania 19101 Gentlemen:
This refers to the QA Program Inspection conducted by Mr. J. R. Costello of this office on December 10-14, 1979, of your facility at Philadelphia, Pennsylvania, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during the QA Program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will be completed.
In accordance with Section 2.790 of the Cocnission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
800314o 2 O g
United Engineers &
2 Constructors, Inc.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
J Sincerely, k
{
k hC%O 6%
Uldis Potapovs, Chi &f Vendor Inspection Branch
Enclosures:
1.
Notice of Deviation 2.
Inspection Report No. 99900510/79-04