ML19290E549

From kanterella
Jump to navigation Jump to search
Immediate Action Ltr 80-04 Confirming 790214 Discussions at Facility & 790215 Telcon Re Manipulation of Controls Which Affect Reactivity W/O Knowledge & Consent of Licensed Operator.Discusses Actions to Be Accomplished
ML19290E549
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 02/15/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lahey R
RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY
References
IAL-80-04, IAL-80-4, NUDOCS 8003140194
Download: ML19290E549 (2)


Text

s.-

Sn at UNITED STATC jo NUCLEAR REGULATORY COMMI5slON

[

o R EGION I h

631 PARK AVENUE 2

KING OF PRUSSI A. PENNSYLVANIA 19406

%*****/

FEB 1 5 1980 Docket No. 50-E25 IAL No. 80-04 Rensselaer Polytechnic Institute ATTN:

Dr. R. T. Lahey, Chairman Department of Nuclear Engineering and Science Troy, New York 12181 Gentlemen:

This letter is to confirm discussions conducted at your facility between Dr. D.

Harris and Mr. P. Nelson of your staff and Mr. T. Stetka of this office on Februar;' 14, 1980 and further telephone discussion with Dr. D. Harris and Mr. E.

J. Brunner of this office on February 15, 1980. The discussions were related to the t.dnipulation of reactor contr]ls which affect reactivity without the know-ledce and consent of the licensed senior operator.

Based on the results of these discussions it is our understanding that critical facility operation will not be conducted until the following actions have been accomplished.

1.

The facility supervisor and other licensed opert. tors will re-review the requirements of Title,10, Code of Federal Regulations, Parts 50 and 55 and the Facility Technical Specifications that relate to the presence of a Licensed Operator 3t the reactor controls during reactor operation.

2.

All students that participate in reactor operations shall be instructed that reactor controls cannot be manipulated unless a licensed individual is present in the control room at the control panel.

3.

The facility telephone shall be relocated or an extension added such that the telephone can be answered by the licensed operator while in the control room at the control panel.

s 8003140

..~

Rensselaer Polytechnic Institute 2

223 1 5 1980 If our understanding of your planned actions as described above is not in accordance with the actual plans and actions being implemented, please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Sincerely, M

p/g ycs H. Grier rector CC:

Dr. D. R. Harris, Facility Director Mr. P. ilelson, Reactor Supervisor Dr. G. Judd, Vice Provost for Plans and Resources

.