ML19290E191

From kanterella
Jump to navigation Jump to search
Application for Amend to License SNM-1227 to Increase Possession Limit of Pu to 125 Kg W/At Least 115 Kg in Encapsulated Form.Pu Will Be Used to Assemble Four Mixed Oxide Fuel Elements
ML19290E191
Person / Time
Site: Framatome ANP Richland
Issue date: 10/22/1979
From: Estey H
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
References
14468, NUDOCS 8003050031
Download: ML19290E191 (2)


Text

i

{

Aff/

30-ly7

~

r 6

  • EkON NUCLEAR COMPANY,Inc.

2101 Horn' Rapids Road P. O. Box 130, Richland, Washington 99352 Phone: (509) 943 8100 Telex: 32-6353

\\\\ O\\

- - 0:. ',,,

October 22, 1979 i

a Mr. W. T. Crow, Section Leader Uranium Process Licensing Section Uranium Fuel Licensing Branch Division of Fuel Cycle & Material Safety U. S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. SNM-1227 Docket No. 70-1257

Dear Mr. Crow:

Exxon Nuclear Company, Inc. has been requested to assemble four mixed oxide fuel elements at its Horn Rapids Fuel Fabrication Plant.

The mixed oxide will be delivered to Exxon Nuclear's Horn Rapids Plant in the form of totally encapsulated finished fuel rods.

They will be assembled into fuel elements, and the fuel elements inspected, packaged and shipped to the customer.

All operations, radiation protection controls and nuclear criticality ssfety controls will be carried out in accordance with license condi-tions described in Document N?. JN-2, ADD-1, Part I',

Section I'B (submitted by letter dated June 4,1971; amended September 20, 1971; May 30, 1972; August 18, 1972; and supplemented by letters dated September 7, 1972 and February 4, 1974) and license issued on July 18, 1974.

Exxon Nuclear wi.ll submit addenda as necessary to our Fundamental Materials Control Plan, XN-12, to the P.aterial Control Licensing Branch, and to our Physical Protection Plan, XN-183 to the Physical Security Licensing Branch in the near future.

Exxon Nuclear hereby requests a temporary amendment of License No.

SNM-1227 to increase the possession tinit of plutonium to 125 kilograms, of which at least 115 kilograms shall be in encapsulated form. All p,pp;;;3nt.............-

Ch wino. 5.?0. W.-

,n
c.;i Tec C ;ti.~~ 1 y!J ^_ ;g-1 '

-^-

j;; ci h.3. M M -

D:;3 c:aA R;c'd. A // j Y l<ecei' icd Cy.. adW -

yy

~-?.

a 14eE8 AN AFFILIATE OF EXXON CORPORATION sooaos00T t

a

(

j',,

, s

\\

W. T. Crow (USNRC) October 22, 1

\\

s

\\

k other conditions of this license shall remain unchanged. Since the term of the license amendment depends on other licensing actions beyond g

our contral, we will advise you when the finished fuel elements are l_-

)(:d,]

shipped from our facility.

?

A check in the amot.nt of $150 is enclosed to cover the associated

'g I administration fee.

d El Sincerely, t

/f

\\

r H. Paul Estey, Manager Licensing & Compliance Richland Facilities HPE:gf

Enclosure:

$150 check CC:

Mr. W. J. Cooley (USNRC Region V IE)

Mr. G. W. McCorkel (USURC, Physical Security Licensing Branch)

Mr. J. G. Partlow (USNRC, Material Control Licensing Branch) 14463

- - -.. -...