ML19290D930
Jump to navigation
Jump to search
| ML19290D930 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/27/1980 |
| From: | Wuller G ILLINOIS POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19290D931 | List: |
| References | |
| U-0125, U-125, NUDOCS 8002290507 | |
| Download: ML19290D930 (1) | |
Text
,
U-0125 L20-80(02-27)-0 ILLINOIS PUlMER COMPANY 500 SOUTH 27TH STREET, DEC ATUR. ILUNOIS 62525 February 27, 1980 Mr. H.
R.
Denton, Director Office of Nuclear Reactor Regulation c /o Dis tribution Services Branch, DDC, ADM Nuclear Regulatory Commission U.S.
Washington, D.
C.
20555
Dear Mr. Denton:
Clinton Power Station Units 1 & 2 50-461 and 50-462 Docket Nos.
CPPR-137 and CPPR-138 Construction Permits Nos.
Part 50.71(b),
to Title 10, Code of Federal Regulations,and l
Pursuant (8)
(10CFR50. 71b) transmitted herewith are eight Guide 10.1, 1979.
Pouer Company Annual Report S incerely,
p.G. E. Wuller Supervisor - Licensing Generation Engineering Department GEW/jh Enclosures C. Buckley, NRC Clinton Project cc:
B.
0
\\
co s 8002200