UnC RECOVERY SYSTEMS
- 0. vision of Un.ted NucIear Corcoration One Narrag < w~ ~v Telachc e 401164 7701 gg A UnC RESOURCES Comosny Wood River J. : :- how. int 02834
/h
/,,,J,\\
N{
CEB: 79-177 s
September 28, 1979 Il RICEIVED yg E
OCT 21979 > '-l O '~
F U. S. Nuclear Regulatory Commission g 5,.,w,.. w, James G. Partlow, Chief 4*
y.$
Material Control and Accountability x
ro
,)
Licensing Branch D,
l -.a
/
Division of Safeguards Washington, D.C.
20555 1
Reference:
Letter, James G.
Partlow to C. E. Bowers dated September 17, 1979 Gentlemen:
The purpose of this letter is to document UNC Recovery Systems' plans for disposition of our waste water lagoons, as discussed in the referenced letter.
Our current plans and actions are directed at disposal of the material in these lagocas by burial at a licensed burial facility.
Our objective is to utilize a process which dries the material to a state where it is acceptable for direct burial in acceptable containers, or to a level where the addition of small amounts of solidifying material (e. g.
portland cement) will make it acceptable for burial in suitable containers.
When this process is ready for implementation, UNC-RS will perform some one-time sampling studies as requested in your letter.
As the procurement of equipment and licensing of this process cannot be accomplished immediately, we expect to utilize an interim process wherein solidifying material is added to lagoon material without benefit of prior drying.
This process will utilize thn same system for assignment of U and U-235 values as is planned for use with the drying process (i.e. establishment of values per unit volume or unit weight, based on accountability measurements made over the time period the material was placed in the lagoons and our estimates of the total volume or weight of the material in the lagoons).
As we do not expect to use this direct solidification process any longer than is neces-51 sary, no sampling program will be conducted.
It is our Munderstandingthatyouareinagreementwiththisapproach.
[
v 9
DOCKETED
\\g g 14337.
usnc s
OCT 101979 >p]
,r3 E
?,!i k
\\-
ngss zm gutsEcn0N
-}
.J DOCKET CLEM 8 0022ib
~,.../
qw
A 4
e UCC James G.
Partlow Page 2 If you desire any additional information, please contact D.
Daigler or J.
L'Ileureux.
Very truly yours, f
C.
Bowers General Manager l
CEB:RJG:cag cc D.
Daigler J. L'Heureux R.
Gregg J.
Dunning
- .