Text

5 UNITED STATES

/

/y a%%,

NUCLEAR REGULATORY COMMISSICN f..,

t-REGloN IV

^

i "s - 'd 611 RY AN PLAZA oRIVE, SUITE 1000

    1. j ARLINGTON, TEXAS 76012

, ddb / E

\\ *..

i 17 DEC 1979

~ d Docket No. 99900104/79-02 Westinghouse Electric Corporation Pensacola Plant Attn:

Mr. F. B. Hyland Manager, Product Assurance P. O. Box 1313 Pensacola, Florida 32596 Gentlemen:

This refers to the QA Program inspection conducted by Mr. L. E. El'.e"..aw of this office on November 26-30, 1979, of your facility at Pensaco.'a, Florida, associ-ated with the manufacture of reactor internals and pressuriuers, and to the discussions of our findings with Mr. C. K. Starks and membe.rs of his staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspacted, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.

You should derefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective cor-rective action in response to their findings.

Areas ernmined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federcl Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report vill be placed in the Com.aission's Public Document Room.

If this report contains any E002150 0 i

s.

s. -

Westinghouse Electric Corporation 2

information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.

Any such application =ust include a full statement of the reasons on the basis of which it is claimed that the informa-tion is proprietary, and should be prepared so that proprietary information identified in the application is contained La a separate part of the docu=ent.

If we do not hear fras you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Uldis Potapovs, Chief Vendor Inspection Branch

Enclosure:

1.

Notice of Deviation 2.

Inspection Report No. 99900104/79-02