Clarifies State of or Views on Interim Operation.Resolution of Pipe Support & Block Wall Problems Will Be Satisfactorily Conducted Per IE 791022 Immediate Action Ltr.Aslb 781221 Order Provides Sufficient Direction.Certificate of Svc Encl
ML19290C597
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/27/1979
From: Sandvik R
OREGON, STATE OF
To: Mccollom K, Mark Miller, Paxton H
Atomic Safety and Licensing Board Panel
References
NUDOCS 8001220144
Download: ML19290C597 (4)


Text

5.N.tE5 /. ?c'C E N

% coengs

  • :"e h

.h ^'

m.

~

m; e,

7

.,. a g /h

'D

/

% {pT C DEPARTMENT OF JUSTICE g

f Pcanneo olvisioN

'4 h

500 Pacific Building s:o s.w. Yamhill 9

g D9,V p g

D@@

en0nbn Il Portland, oregon F204 p

l Teiephone: G03) 35725 4 dj 3

lh' Ui }iJ iJ J

December 27, 1979

.s i

QP v1 o

Farshall E.

.v_ iller, Esq., Chairman Dr. Kenneth A. McCollom, Dean Atomic Safety and Licensing Board Division of Engineering, U.S. Nuclear ?agulatory Commission Architecture and Technology Washingto=, D.C.

20555 Oklahoma State University Stillwater, Oklahoma 74074 Dr. Eugh C. Fazton 1229 41st Street L:s Al=r,s, New Mexico 87544 In the Matter of Portland General Electric Company, et al.

(Trojan..uclear Plant)

Docket No. 50-344 (Control Buildine)

C-antieren:

The purpose cf this letter is to provide the Board wi.h clarification of Oregon's views on interin operation cf Trojan as expressed in our December 21, 1979 letter to Ci=l- = n vii'=-

In that letter, in response to Paragraph 5 in he noard ' s November 3 0, 1979 Order, Oregon stated that c:::inced interin operation of Trojan was not inimical to the p blic heal-h. and safety so long as certain unresolved questions relating to piping systems and concrete block walls were sinisfied.

We also stated that Oregon would make every effort satisfy itself as to the two questions prior to the December 28, 13 7 9 hea-Lng.

C=r letter did not nake clear Oregon's belief that resolu-t cn of its concerns as to piping supports and block walls w_il be satisfacterily conducted through the regulatory pr: sss alreafy initiated by the NRC's Office of Inscection and " #orcerent, by its October 22, 1979 Immediate A'ction Letter as supp1=-=--=# on Decerter 20, 1979.

By its actions, the 1785 033 8001220149

t r

ASLAB December 27, 1979 Page 2 office of Inspection and Enforcement has effectively precluded the startup of Trojan until the piping support and block wall problems are resolved.

Oregon will review the information and engineer-ing analysis being developed by PGE and the NRC staff and will endeavor to aid in achieving a complete resolution of all safety issues prior to revocation of the October 22 Immediate Action Letter.

Oregon thus believes that the Board's Order of December 21, 1978 provides the Office of Inspection and Enforcement with sufficient direction to resolve these issues without further action by the Board.

Very truly yo s,

h~tcJ.%v-Richard M. Sandvkk Frank W.

Ostrander, Jr.

Of Attorneys for Oregon Department of Energy dg cc:

Trojan Service List e

4 1785 034

RRr %yy 6.st*%

CERTIFICATE OF SERVICE I, Frank W. Ostrander, Jr. hereby certify that on this 27th day of December, 1979 I served the within letter to the Atomic Safety and Licensing Board upon the following parties of record by then depositing in the United States Post Office at. Portland, Oregon, full, true, and correct copies thereof, addressed to the said parties of record at the following addresses listed below, and prepaying the postage thereon:

Mr. John A.

Kullber g Offic.e of the Executive Legal f

Route One, Box 2500 Director Sauvie Island, OR 97231 U.S.

Nuclear Regulatory Comm'n f Washington, DC 20555 Columbia Environmental Council E

203 S. First Street Alan S.

Rosenthal, Esq.

St. Helens, OR 97051 Atomic Safety and Licensing Appeal Board Dr. Reed Johnson U.S. Nuclear Regulatory Comm'n Atomic Safety and Licensing Washington, DC 20555 Appeal Board U.S.

Nuclear Regulatory Comm'n Dr. John Buck-Washington DC, 20555 Atomic Safety and Licensing Appeal Board Mr. David B.

McCoy U.S. Nuclear Regulatory Comm'n 348 Hussey Lane Washington, DC 20555 Grants Pass, OR 97256 Docketing and services Section Ms. C. Gail Parson Office of the Secretary 800 S.W. Green #6 U.S.

Nuclear Reg 131atory Comm' n Portland, OR 97205 Washingcon, DC 20555 Mr. Stephen M. Willingham Atomic Safety and Licensing 555 N. Tomahawk Drive Appeal Board Portland, OR 97217 U.S. Nuclear Regulatory Conm'n Washington, DC 20555 eps l r, Y

v

  • N(p.

178S 035 e. @e..Q v /

c 2

1 - CERTIFICATE OF SERVICE A

C co

$ Mgemassaas-

<b y\\,\\F/

I also certify that on the 28th of December, 1979 I personally served full, true and correct copies thereof on the following parties of record:

Marshall E. Miller, Esq., Chair.

William W.

Kinsey Atomic Safety and Licensing Board 1002 N.E. Holladay U.S. Nuclear Regulatory Comm'n Portland, OR 97232 Washington, DC 20555 Dr. Kenneth A. McCollom, Dean Division of Engineering, Architecture & Technology Oklahoma State University Stillwater, OK 74074 Dr. Hugh Paxton 1220-41st Street St. Helens, OR 97051 Maurice Axelrad, Esq.

Lowenstein, Newman, Reis, Axelrad & Toll Suite 1214 1025 Connecticut Avenue NW Washington, DC 20036 Ronald W. Johnson, Esq.

Corporate Attorney Portland General Electric 121 S.W.

Salmon Street Portland, OR 97204 Ms. liina Bell 632 S.E.

18th Portland, OR 97214 Mr. Eugene Rosolie Coalition for Safe Power 215 S.E.

9th Avenue Portland, OR 97214 Joseph R.

Gray Counsel for NRC Staff U.S.

Nuclear Regulatory Comm'n Washington, DC 20555

/m bi \\ / - ) I\\,

?

/

(5

\\

F RICE W.' O.*.,TPM DER JR.

g Assistant Attorney' General 2 - CERTIFICATE OF SERVICE