M

,r-~;)3

  • QC )

Wisconsin Electnc eom cowa 231 W. MICHIGAN, P.O. EiOX 2046, MitWAUKEE, WI 53201 December 20, 1979 Mr. J.

G.

Keppler, Regional Director Office of Inspection and Enforcement, Region III U.

S.

NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET NOS. 50-266 AND 50-301 FURTHER RESPONSE TO IE BULLETIN 79-14 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 IE Bulletin 79-14 requires licensees to verify for safety-related piping systems that the as-built systems conform to the as-designed seismic analysis and acceptance criteria.

The purpose of this submittal is to provide a progress report on our Bulletin compliance program.

This report is a supplement to our responses of August 1, September 7, and November 2, 1979.

A.

PIPING SYSTEM INSPECTIONS Our November 2, 1979, submittal reported that all applicable outside containment (for both units) and all Unit 1 inside containment piping systems had been inspected.

However, during a subsequent review, it was determined that the service water piping inside the pumphouse had not yet been inspected; this portion of the service water piping was the responsibility of a separate contractor during the original plant construction.

The design information applicable to this piping has been obtained from the original designer and an inspection package will be prepared.

The actual inspection of this piping is planned for the Unit 2 refueling outage when the remainder of the piping inspections will be perforned.

B.

E STEM EVALUATIONS Phasa 1 refers to the initial engineering judgment evaluations and Phase 2 refers to the detailed analytical evaluations.

I787 241 UR 261879 m 22o y

__1_

Mr. J.

G.

Keppler December 20, 1979 PHASE 1 EVALUATIONS For inspected piping systems, all of these evalua-tions were completed by November 2, 1979.

All were judged adequate except for two systems.

These were the Unit 2 main feedwater piping outside containment, where one support required modification, and the Unit 1 auxiliary coolant system, AC-60lR outside containment piping, where eight supports required modification and one new support was added to the system; the Unit 2 feedwater support problem was reported in our November 2, 1979 submittal.

All required modifications have been completed.

PHASE 2 EVALUATIONS A major part of our inspection and analysis program has been the creation of piping isometric drawings.

The 57 applicable piping categories, as discussed in our November 2, 1979 submittal, have resulted in the creation of about 85 piping isometric drawings; some systems require more than one drawing to adequately describe the system.

These drawings have required a considerable amount of effort, but are necessary for the performance of the required analysis.

The attached table is organized with respect to these piping isometric drawings.

The table lists the drawings that have been completed with respect to piping stress and pipe support analysis, presents scheduled dates for completion of the remaining analyses, and identifies the organization (Bechtel Power Corporation or Westinghouse Electric Corporation) performing the detailed analysis.

The table shows that the piping stress analysis for 45 drawings (53%) is complete and the pipe supports have been evaluated for 18 (21%) of these drawings.

While not indicated by the table, about 88% of the pipelines have been modeled and are in the process of stress analysis.

The table also indicates the presently identified number of modifications required to ensure that the piping and support stresses meet acceptable stress criteria.

Identified modifications that have not yet been completed are in the design stage and repair work will commence when the design is released for construction.

1787 242

Mr.

J.

G.

Keppler December 20, 1979 A review of the dates contained within the table shows that we expect to have the analytical portion of this part of our Bulletin 79-14 program complete by about mid-January 1980.

Accordingly, we anticipate that our next submittal will be forwarded to NRC in February 1980.

If you require any additional information at this time, please contact us.

Very truly o rs, C.

W.

Fay, rector Nuclear Power Department Attachment Copy to: Office of Inspection and Enforcement Division of Reactor Operations Inspection Mr.

A.

Schwencer, Chief Operating Reactors Branch 1 1787 243

POINT BEACH NUCLEAR PLANT STATUS OF STRESS ANALYSIS & PIPE SUPPORT REVIEW FOR NRC IE BULLETIN 79-14 PIPING LOCATION STATUS OF STATUS OF STRESS INSP.

SYSTEM UNIT UNIT STRESS ANALYSIS PIPE SUPPORT REVIEW (B)

ANALYSIS APPROX.

ISO. DWG.

PKG.

LINE INITIAL FINAL BY MODIFICATIONS N0.

NO.

NO.

1 2

DATE REVIEW REVIEW REQUIRED DATE DATE P-100 23 HB-29 0

DONE DONE 12/18/79 BEC P-101 13a SI-30lR 0

DONE DONE 12/21/79 W

P-102 3

SI-151R 0

12/19/79 12/17/79 1/7/80 W

P-103 8-2&21 DB-3 0

DONE DONE 12/20/79 BEC-EDAC P-104 14 SI-60lR-2 0

12/15/79 12/17/79 12/27/79 BEC P-105 7-2 WD-151 R-8 0

12/21/79 DONE 1/11/80 W

7A WD-151R-8 I

EMBED N/A 1/7/80 W

P-106 2-2 EB-8 0

12/19/79 P-107 2-1 EB-1 0

DONE DONE 12/20/79 BEC P-108 48 EB-1 I

DONE DONE DONE BEC-EDAC 0

P-109 17 AC-151R-10 0

DONE 12/17/79 12/26/79 BEC P-110 7-1 WD-151R-23 0

12/21/79 1/11/80 W

P-lli 2-3 EB-9 0

12/15/79 12/17/79 12/27/79 BEC P-ll2 45 EB-9 I

12/15/79 12/17/79 12/27/79 BEC P-ll3 1-2 HB-19 0

12/17/79 12/18/79 1/2/80 BEC P-ll4 1-1 HB-19 0

12/17/79 12/18/79 1/4/80 BEC P-115 51 HB-19 I

12/17/79 12/18/79 1/3/80 BEC-J.B.

P-ll6 51 HB-19 I

12/17/79 12/18/79 1/3/80 BEC P-ll7 4-la JG-4 0

DONE DONE DONE W

6 1/7/80 W

P-ll8 4-lb JG-2 0

12/31/79

-3 0

-4 0

P-119 10 SI-150lR-1 0

DONE 12/21/79 1/11/80 W

-2 0

-3 0

P-120 44 SI-150lR-2 I

DONE DONE DONE W

2 (DONE) 8-l&21 DB-1 0

12/18/79 12/19/79 12/31/79 BEC P-121 P-122

-J 9-5 CH-151R-3 0

12/17/79 12/18/79 12/31/79 BEC CD

-8 0

P-123

'd 9-1 CH-151 R-1 0

12/20/79 1/8/80 BEC

/

P-124 9-2 CH-151R-4 0

12/20/79 12/21/79 1/8/80 BEC P-125 r2f 9-3 CH-151R 0

12/20/79 12/21/79 1/3/80 BEC P-126 31 9-4 CH-151R-23 0

12/17/79 12/18/79 1/7/80 BEC Page 1 of 4

PIPING LOCATION STATUS OF STATUS OF STRE55 IllSP.

SYSTEM UNIT UtilT STRESS ANALYSIS PIPE SUPPORT REVIEW (B)

ANALYSIS APPR0X.

150. DWG.

PKG.

LIf;E INITIAL FINAL BY MODIFICATIONS NO.

NO.

NO.

1 2

DATE REVIEW REVIEW REQUIRED DATE DATE P-127 11 CH-2502R-l 0

12/17/79 12/18/79 1/7/80 BEC

-2 0

-3 0

P-128 13-2 SI-30lR-l I

DONE 12/21/79 1/7/80 W

P-129 13-2 SI-30lR-1 I

DONE DONE DONE W

2 P-131 47 SI-150lR-3 I

DONE DONE DONE BEC 1

P-132 5

AC-60lR-2 0

12/15/79 12/17/79 1/11/80 BEC

-3,-4,-l 50 SI-151R-X I

EMBER N/A 0

P-133 5

AC-60lR-6 0

12/15/79 12/17/79 1/7/80 BEC P-134 5

AC-60lR-6 0

12/15/79 12/17/79 1/7/80 BEC P-135 51 HB-19 I

12/17/79 12/18/79 1/3/80 BEC-J.B.

P-136 24 SI-60lR-2 I

DONE DONE DONE W

3 SI-250lR-5 RC-250lR-5 P-137 24 RC-250lR-5,8 I DONE DONE DONE W

5 SI-250lR-1 2,4,5 P-138 51 HB-19 I

12/17/79 12/18/79 1/3/80 BEC-J.B.

P-139 4-2 HB-19 0

12/17/79 12/18/79 1/10/80 BEC JB-2 P-140 2-4 EB-10 0

DONE D0flE 12/19/79 BEC-EDAC 43 EB-10 I

DONE DONE 12/19/79 BEC P-141 2-4 EB-10 0

DONE DONE 12/19/79 BEC-EDAC P-142 43 EB-10 I

DONE DONE 12/19/79 BEC P-143 41 RC-250lR-1 I

DONE DONE DONE W

8 P-144 41 RC-250lR-2 I

DONE DONE DONE W

0 P-145 41 RC-250lR-Z I

DONE DONE DONE W

0 P-146 41 RC-250lR I

DONE DONE DONE W

2 P-147 15 CH-60lR-1 I

EMBED N/A 0

P-148 12 AC-60lR-2 I

DONE DONE DONE W

5

-6 P-149' 6

AC-152N 0

DONE DONE 12/19/79 BEC-EDAC P-15Y 49 AC-152N-4 I

DONE DONE DONE BEC-J.B.

3 P-15(2 P-1 49 AC-152N-4 I

DONE DONE DONE BEC-J.B.

O 49 AC-152N-4 I

DONE DONE DONE BEC-J.B.

2 N

_C:=

tn Page 2_of 4

PIPING LOCATION STATUS OF STATUS OF STRESS INSP.

SYSTEM UNIT UNIT STRESS ANALYSIS PIPE SUPPORT REVIEW (B)

ANALYSIS APPR0X.

ISO. DWG.

PKG.

LINE INITIAL FINAL BY MODIFICATIONS NO.

N0.

NO.

1 2

DATE REVIEW REVIEW REQUIRED DATE DATE P-153 6

AC-152N 0

DONE DONE 12/18/79 BEC-EDAC P-154 16 CH-250lR-4 I

DONE DONE DONE BEC 4

CH-2502R-3 P-155 9A CH-151R-2 0

12/26/79 12/27/79 1/14j80 BEC

-11 P-156 1

HB-19 0

12/17/79 12/18/79 1/10/80 BEC P-157 151 PA-151R-1 I

DONE DONE DONE BEC-J.B.

O P-201 28A SI-30lR 0

12/19/79 1/7/80 W

P-202 18 SI-151R 0

12/28/79 1/11/80 W

1/11/80 W

P-204 35 SI-60lR-2 0

12/28/79 P-206 19 EB-8 0

12/19/79 1/11/80 W

P-207 39 EB-1 0

DONE DONE 1/2/80 BEC P-211 22 EB-9 0

12/15/79 12/17/79 1/3/80 BEC P-213 l-5 HB-19 0

12/17/79 12/18/79 1/9/80 BEC JB-2 4-2 HB-19 0

12/26/79 12/27/79 1/9/80 BEC JB-1

-2 P-214 l-5 HB-19 0

12/17/79 12/18/79 1/10/80 BEC JB-1

-2 P-215 1-5 HB-19 0/I 12/17/79 12/18/79 1/11/80 BEC P-216 1-5 HB-19 0/I 12/17/79 12/18/79 1/9/80 BEC P-219 25 SI-150lR-1 0

DONE 12/21/79 W

12/21/79 W

P-220 25 SI-150lR-2 0

DONE P-221 20 DB-1 0

12/15/79 12/17/79 1/4/80 BEC P-222 20 EB-9 0

12/15/79 12/17/79 1/5/80 BEC DB-1 P-223 27 CH-151R-1 0

12/20/79 12/21/79 1/12/80 BEC P-224 27 CH-151R-1 0

12/20/79 12/21/79 1/12/80 BEC P-225 27A CHl51R-2 0

DONE DONE 12/18/79 BEC-J.B.

-11 P-227

~J 26 CH-2502R-2 0

DONE DONE 12/19/79 BEC-J.B.

CD

-3 P-228

'd 26 CH-2503R-2 0

DONE DONE 12/19/79 BEC-J.B.

-3 g

n Os Page 3 of 4

PIPING LOCATION STATUS OF STATUS OF STRESS INSP.

SYSTEM UNIT UNIT STRESS ANALYSIS PIPE SUPPORT REVIEW (B)

ANALYSIS APPROX.

150. DWG.

PKG.

LINE INITIAL FINAL BY MODIFICATIONS NO.

NO.

NO.

1 2

DATE REVIEW REVIEW REQUIRED DATE DATE P-231 28A SI-30lR 0

DONE DONE 1/2/80 BEC-J.B.

P-232 30 AC-60lR-1 0

12/28/79 1/11/80 W

-2

-3 P-233 30 AC-60lR-4 0

12/28/79 1/11/80 BEC P-234 30 AC-60lR-6 0

12/28/79 1/11/80 BEC P-240 2-4 EB-;0 0

DONE DONE 12/28/79 BEC-EDAC P-241 2-4 EB-10 0

DONE DONE 12/28/79 BEC-EDAC P-249 29 AC-152N 0

DONE DONE 12/27/79 BEC-EDAC P-253 29 AC-152N 0

DONE DONE 12/27/79 BEC-ECAC P-255 27A CH-151R-2 0

DONE DONE 12/27/79 BEC

-11 Definitions:

I Inside containment 0

Outside containment BEC Bechtel Power Corporation W

Westinghouse Electric Corporation EDAC Subcontractor to Bechtel JB Subcontractor to Bechtel Page 4 of 4 CD

'~J N

b N