Ack Receipt of in Response to NRC . Requests Addl Info Re Welding Engineering Memo & Changes Made in Welding Procedures
ML19290C521
Person / Time
Issue date: 08/15/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tharp W
GUY F. ATKINSON CO.
Shared Package
ML19290C516 List:
References
REF-QA-99900031 NUDOCS 8001220044
Download: ML19290C521 (2)


Text

!e ara Io, UNITED STATES s

8hp j

NUCLEAR REGULATORY COMMISSION M.9/ o [E

%G REGION IV 3,, [

611 RYAN Pt.AZ A DRIVE, SUITE 1000

% '.S #

o AR LINGToN, TE X AS 76012

+...

15 pua 1979 Docket No. 99900031/79-01 Bingham-Willa=ette Company ATTN:

Mr. W. E. Tharp President and General Manager 2800 N. W. Front Avenue Portland, Oregon 97210 Gentlemen:

Thank you for your letter of Jane 14, 1979, in response to our letter dated May 21, 1979.

As a result of our review, ue find that additional information on the following items is needed:

A.

Our review of your response indicates an apparent failure on your part to recognize the significance of the Welding Engineer memorandum of February 9, 1979. Without this memorandum, which permitted a change in an ASME Code essantial variable, i.e.,

composition of deposited weld metal, we would concur adequacy of qualification of the two cited welding procedures would be supported by the Preamble to Section IX of the ASME Code. This is not to say that we would not have concerns relative to the technical adequacy of qualification of the two procedures.

On changing the two welding procedure specifications, however, frcm what was originally qualified, you effectively created new welding proce-dures which would require requalification in accordance with the test requirements of the current edition of Section IX of the ASME Code.

This, in itself, would require resolution of the other items referenced in the cited finding.

As regards your statements on the Winter 1978 Addendum being the current Edition of the Code relative to qualification test requirements, we would refer you to QW-100.3 in the Winter 1978 Addendum to Section IX of the ASME Code.

This permits " current Edition" to be defined as either mandatory Addenda at the date of order, or any later Addenda.

The inspector chose, for the purpose of fairness, to prepare the finding relative to the 1976 Summer Addendum requirements, for which you have an applicable contractual co=mitment.

We are quite aware that NB-4382 was subsequently deleted from Section III of the ASME Code, but only as a result of an ASME decision to place the requirements in ASME Section IX (QW-282).

We trust the above comments will result in further consideration of this subject and produce a response, which is consistent with the corrective action statements contained in the transmittal letter for Inspection Report No. 79-01.

oOY 1788 071 80012

Bingham-Willamette Company 2

B.

Please clarify how your committed steps to prevent recurrence will be accomplished.

Please provide this additional information within twenty (20) days in order that we may complete our review in a timely manner.

Sincerely, i

( \\

t lm G lu 'h'

'?

Uldis Potapovs, Chief Vendor Inspection Branch 1788 072