Responds to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co. Util Expects Further Guidance from NRC Re Optimum Method for Examining Spools
ML19290C517
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/02/1980
From: Hines E
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-03, IEB-79-3, NUDOCS 8001220036
Download: ML19290C517 (2)


Text

.

[

, Edward Hines Ass.5'd" VC e' hCS& et Q Jot y A5%J'4"Cf*

' Detroit m.

e Edison wm...-.n.

January 2, 1980 EF2-47,351 Mr. James G. Keppler e Regional Director .bb ~ d U.S. Nuclear Regulatory Cornission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Subject:

Detroit Edison Interim Response To USNRC IE Bulletin 79-03 Ar explained in the attached memorandum, EF2-46,338 revision A, Edison is expecting further direction from the NRC as to the optimum method for examining the affected piping spools. Also, we are correcting a previous error in reporting the number of spools affected.

Another interim or final report will be provided by April 19, 1980.

Very truly yours, k W'er s 'b EH/TGB/Im Enclosure cc: Mr. John G. Davis Acting Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission 1787 223 Washington D.C. 20555 8001220 0 36 JAN'l 1980

Detroit Edisun -------- EhRICO FERMI UNIT 2 PROJECT ENGINEERING RECEIvgp gy December 28, 1979 EF2 - 46338 R. W. BARR Revision A To: R. W. Barr Project Quality Assurance Director 206 Engineering Construction-Troy j j From: F. E. Gregor System Engineer - EF2 s ,

318 En;;ineering Construction-Troy i

Subject:

Follow-up Report and Correction IE-Bulletin No. 79-03, EF2-45807 In a previous letter to the NRC-I&E Region III (EF2-46920 of August 23, 1979) a commitment was made to submit a final or interim report within 120 days. On September 5, 1979 we were advised by Mr. Ed Lee of NRC Region III(

Reference:

F250-1435, H. Walker to W. Fahrner) that NRC is reevaluating the IEB-79-Oa and may issue a revised bulletin. Our planned UT examination was, therefore, postponed to await further directions.

On December 21, 1979, a telephone call was initiated with Mr. D. Danielson of the NRC - I&E Region III to assess the current status of the bulletin and to advise the NRC of our holding pattern. This letter is to docu-ment the above telephone call (T. Byrd/F, E. Gregor - D. Danielson).

In addition to the above, we also identified an error in our earlier reports (EF2-46920 and EF2-45807). The reports listed a total of 12 affected spool pieces. The correct number of piping spools affected is 40 (forty) of which 38 are safety-related. The error occurred due to a typographical omission of the word "thru." All affected pieces had been identified but the counting was wrong.

FEG/dk 7b 224 APPROVED -' [*&

W.F.Colbert/

Project Engineer Enrico Fermi 2 cc: M. G. Sigetich/T. O'Keefe T. Byrd W. M. Everett Document Control C. R. Bacon /W. Buchanan Fran Barnes (Bulletin-File)