Text
[
Edward Hines Ass.5'd" VC e' hCS& et Q Jot y A5%J'4"Cf*
' Detroit Edison wm...-.n.
- m. e January 2, 1980 EF2-47,351 Mr. James G. Keppler e
Regional Director
.bb ~ d U.S. Nuclear Regulatory Cornission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Subject:
Detroit Edison Interim Response To USNRC IE Bulletin 79-03 Ar explained in the attached memorandum, EF2-46,338 revision A, Edison is expecting further direction from the NRC as to the optimum method for examining the affected piping spools.
- Also, we are correcting a previous error in reporting the number of spools affected.
Another interim or final report will be provided by April 19, 1980.
Very truly yours, k W'er s
'b EH/TGB/Im Enclosure cc:
Mr. John G. Davis Acting Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission 1787 223 Washington D.C.
20555 8001220 0 36 JAN'l 1980
Detroit Edisun --------
EhRICO FERMI UNIT 2 PROJECT ENGINEERING RECEIvgp gy December 28, 1979 EF2 - 46338 R. W. BARR Revision A To:
R. W. Barr Project Quality Assurance Director 206 Engineering Construction-Troy j
j From:
F. E. Gregor System Engineer - EF2 s
318 En;;ineering Construction-Troy i
Subject:
Follow-up Report and Correction IE-Bulletin No. 79-03, EF2-45807 In a previous letter to the NRC-I&E Region III (EF2-46920 of August 23, 1979) a commitment was made to submit a final or interim report within 120 days. On September 5, 1979 we were advised by Mr. Ed Lee of NRC Region III(
Reference:
F250-1435, H. Walker to W. Fahrner) that NRC is reevaluating the IEB-79-Oa and may issue a revised bulletin. Our planned UT examination was, therefore, postponed to await further directions.
On December 21, 1979, a telephone call was initiated with Mr. D. Danielson of the NRC - I&E Region III to assess the current status of the bulletin and to advise the NRC of our holding pattern. This letter is to docu-ment the above telephone call (T. Byrd/F, E. Gregor - D. Danielson).
In addition to the above, we also identified an error in our earlier reports (EF2-46920 and EF2-45807). The reports listed a total of 12 affected spool pieces. The correct number of piping spools affected is 40 (forty) of which 38 are safety-related. The error occurred due to a typographical omission of the word "thru."
All affected pieces had been identified but the counting was wrong.
FEG/dk APPROVED -' [*&
7b 224 W.F.Colbert/
Project Engineer Enrico Fermi 2 cc:
M. G. Sigetich/T. O'Keefe T. Byrd W. M. Everett Document Control C. R. Bacon /W. Buchanan Fran Barnes (Bulletin-File)