ML19290C398
| ML19290C398 | |
| Person / Time | |
|---|---|
| Issue date: | 03/16/1978 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Mattson R Office of Nuclear Reactor Regulation |
| References | |
| REF-GTECI-A-17, REF-GTECI-SY, TASK-A-17, TASK-OR NUDOCS 8001110217 | |
| Download: ML19290C398 (2) | |
Text
'
)
p Mo o
UNITED STATES
/
t y
NUCLEAR REGULATORY COMMISSION O[{
g' E
WASHINGTON, D. C. 20555 MAR 161978 MEMORANDUM FOR:
R. J. Mattson, Director, Division of Systems Safety, NRR FROM:
R. L. Tedesco, Assistant Director for Plant Systems, DSS
SUBJECT:
ASSIGNMENT OF PLANT SYSTEMS, DSS, PERSONNEL TO TAP A-17, SYSTEMS INTERACTION In response to 'our memorandum dated March 9, 1978, concerning the subject, we are providing you with the names of reviewers that will be made availa-ble for 20% of their time for work on TAP A-17.
These are:
ASB - Chu Liang ICSB - Hobart Li CSB - John Zwolinski PSB - Harry Balukjian The potential impact of these assignments has been evaluated and until a detailed schedule for TAP A-17 is set forth for utilization of the manpower, only the following can be stated at this time.
CSB - The work effort required on a contract with LASL has been assigned to another reviewer.
The Susquehanna review schedule will be stretched cut.
The Bellefonte review schedule will be stretcLad out.
The Waterford review schedule will be delayed.
ASB - One or more of the following project reviews will be stretched out or delayed: Sun Desert Fire Protection, San Onofre Fire Protection, FFTF SER and Fire Protection, ESSAR and WPPSS Units 3 and 5 Fire Protection.
ICSB - One or more of the following project reviews will be stretched out or delayed: McGuire, Salem Unit 2, Pebble Springs, Erie, BOPSSAP, (B-SAR-205) and a long-term SRP revision.
1732 306 8 0 01110 Z l 7
e R. J. Mattson.
PSB - One or more of the following project reviews will be stretched out or delayed: LaSalle, Summer, New England, Catawba Fire Protection, Bellefonte Fire Protection, Clinton Fire Protection, Comanche Peak Fire Protection and Hartsville Fire Protection.
\\
r R. L. Tedesco, Assistant Di* rector for Plant Systems Division of Systems Safety cc:
E. G. Case /
R. S. Boyd F. Schroeder W. Minners M. Aycock R. DeYoung V. Benaroya G. Lainas T. Ippolito F. Rosa D. Fischer P. Matthews
- 1. Kudrick J. Shapaker C. Miller M. Srinivasan 1732 307 C. Long