Discusses Revision 1 to Task Action Plan A-17 Re Sys Interaction.Requests Addl Paragraph to Inform Technical Activities Steering Committee of Previous Deliberations
ML19290C395
Person / Time
Issue date: 03/06/1978
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Deyoung R
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-17, REF-GTECI-SY NUDOCS 8001110185
Download: ML19290C395 (2)


Text

.

CM f

[

UNITED ST ATES y"

NUCLEAR REGULATORY COMMISSION

{

E W ASHINGTON, D. C. 20555

%...../

MAR 6 1978 MEMORANDUM FOR:

Richard C. DeYoung, Deputy Director, Division of Project Management, ONRR FROM:

Harold R. Denton, Director, Division of Site Safety and Environmental Analysis, ONRR

SUBJECT:

REVISION 1 TO SYSTEMS INTERACTION TASK ACTION PLAN (TAPA-17)

As you know, we have previously suggested that less complex methods than those proposed could be used to identify systems interactions which are of greatest concern without a detailed evaluation of all plant systems. Through discussions between our groups, it was agreed that the proposed method would initially be pursued and the applica-bility of other methods could be determined as insights were gained.

This approach is still acceptable to us.

However, because of the large estimated contractor expenditure, it seems appropriate to inform the Technical Activities Steering Committee of our previous deliberations.

Therefore, I request that the following paragraph be included i'i your TAP A-17 transmittal letter to the Technical Activities Steering Comittee.

"We have discussed an alternative approach with DSE.

This basically relies upon the insights gained in WASH-1400 (and its expansion to other more current designs) to limit the scope of review to those areas which contribute significantly to risk.

While this approach has the potential for simplifying the overall task and limiting our efforts to areas which can influence risk, DSE has agreed to initiating the program as proposed. Rather than departing radically from past practice at the onset, risk analysis may be employed later if initial task efforts so indicate."

We also note that the method proposed in the plan will require detailed information on the physical layout of plants in order to evaluate all potential interactions.

The first full sentence on page 6 should be expanded to reflect this detail as follows:

and ether deeuments detailed equipment arrangement, piping layout and P&I drawings,..."

1732 3ll s o o 1110~ l 86

?

MAR 6 1978 2

Richard C. DeYoung Mr. G. L. Chipman of the Accident Analysis Branch and Mr. W. C. Burke of the Effluent Treatment Systems Branch are designated to represent DSE on the NRR Advisory Group for Systems Interaction,

g..... e - --q.

r

. :a Harold R. Denton, Director Division of Site Safety and Environmental Analysis Office of Nuclear Reactor Regulation cc:

D. Muller D. Wigginton J. Angelo

!1. Aycock R. Vollmer J. Collins W. Burke D. Bunch G. Chipman Distribution,:

l[32 j}2 Central Files DSE Rdg. File AAB Rdg. File AAB Files E

E:JISB DSE; FAB DSgADlSA

....DS.,,_.

or >c.

  • D.

9 R/Vo$mer H.dnton k-[$6 ch

?7917,,,,,,,,,(

dr Te ullins

-78 g'V-78 Q -78 1-M 78 5-f-78

- / -78

\\

=crom m i,.m = = mo

  • ...................-.._u