ML19290B862

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator.Full Load Test of Emergency Diesel Generator to Be Carried Out for Not Less than 24-h
ML19290B862
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 10/31/1979
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-23, NUDOCS 7912140267
Download: ML19290B862 (1)


Text

cf d TlC K flL E F Thomas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice President Engineering and Construction October 31, 1979 r

Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC IE BULLETIN NO. 79-23 POTENTIAL FAILURE OF EMERGENCY DIESEL GENERATOR FIELD EXCITER TRANSFORMER NO. 1 AND 2 UNITS HOPE CREEK GENERATING STATION In reply to IE Bulletin No. 79-23 dated September 12, 1979, we offer the following response:

1. The connection between low KVA rated potential trans-formers and high KVA rated EDGs are such that the circulating harmonic currents cannot flow. Consequently, no corrective action is required.
2. Full load test of the emergency diesel generator for a duration of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, of which 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> will be at a load equivalent to continuous rating (4430 KW) and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at a load equivalent to the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> rating (4873 KW) will be conducted prior to the commercial operation of the plant. The tentative dates will be September, 1984 for Unit No. 1 and July, 1986 for Unit No. 2. The test will also verify that voltage and frequency requirements are maintained and that the cooling system will function within design limits.

Should additional information be desired, we will be pleased to further discuss it with you.