Responds to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Completed Volumetric Examination of nozzle-to- Transition Piece & Transition piece-to-piping Welds on Steam Generators.No Cracks or Code Discontinuities Identified
ML19290B849
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/18/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-13, NUDOCS 7912140238
Download: ML19290B849 (1)


Text

_

~ '*

CENTRAL FILES 026 PDR:HQ O

ARKANSAS >>OWER & LIGHT COMPANY POST OFflCE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 October 18, 1979 2-109-16 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 IE Bulletin 79-13 (File: 2-1510)

Gentlemen:

As required by Item la. of IE Bulletin 79-13 we have completed volumetric examinations of the nozzle-to-transition piece and transition piece-to-piping welds on both steam generators in the ANO-2 NSSS. No crack indica-tions or unacceptable code discontinuities have been identified.

In addition to the weld examinations we have performed a visual examina-tion of feedwater system piping supports and snubbers in containment. All supports and snubbers were found to be operable and in conformance with design specifications.

Very truly yours,

&ond P VUk David C. Trimble Manager, Licensing DCT/M0W:ata cc: Mr. W. D. Johnson Nuclear Regulatory Commission P. O. Box 2090 1574 234 Russellville, Arkansas 72801 7 912140 E MEMBEA MrOOLE GOUTH UTlUTIES SYSTEM