ML19290A364

From kanterella
Jump to navigation Jump to search
Amend 8 to DPR-50 Re 90-day Chlorination Testing Period
ML19290A364
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/16/1975
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19290A363 List:
References
NUDOCS 7911060601
Download: ML19290A364 (5)


Text

-

4 8

UNITED STATES NUCLEAR REGULATORY COMMisslotJ W ASHINGTON. D. C. 20555 METROPOLITAtt EDISO.1 C0r1PA'lY_

DOCKET t10. 50-289 THREE MILE ISLAt1D T1UCLEAR STATI0tl. Ut!IT 1 AMENDMEllT TO FACILITY OPERATIt1G LICENSE Amendment No. 8 License No. DPR-50 The Nuclear Regu'atory Ccemission (the Ccemission) has found that:

j 1.

The application for amendment by Metropolitan Edison Comcany A.

(the licensee) dated !!ay 7,1975, ccmplies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Ccmmissicn's rules and regulations set forth in 10 CFR Chapter I; The facility will coerate in confomity with the.apolication, B.

the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized C.

by this amendment can be conducted without endangering the health and safety of the cublic, and (ii) that such activities will be conducted in ccepliance with the Cccmission's regulaticns; and The issuance of this amendment will not be inimical to the D.

'tamion defense and security or to the health and safety of the 4

public.

Accordingly, the license is amended by a change to the Technical 2.

Specificatiens as indicated in the attachment to this license amend-ment and Paragraph 2.C.(2) of Facility License No. DPR-50 is hereby amended to read as follows:

1556 151 4

$oWU4 1

Op %$

d(W9_/

\\

2 9 n os0 6W

2

"(2) Technical Scecifications The Technical Specifications contained in Appendices A and B, as revised, are hereby incorporated in the license.

The licensee shall operate tne facility in accordance with the Technical Specifications as revised by issued caanges thereto througn Change lo. 9."

3.

This license amendment is effective as the date of its issuance.

FOR THE NUCLEAR REGULATORY CC:'.MISSIO:1 b YN Daniel R. Muller, Assistant Director for Environmental Projects Division of Reactor Licensing

Attachment:

Change No. 8 to the Technical Specifications Date of Issuance:

OCT 1 0 ~675 e

1556 152 e

i s

~-

^

.--w.

. = ~

^

ATTACHEMErlT TO LICEilSE AMEf;DMEilT AMENDMEtlT fl0. 8 TO FACILITY OPERATIT!G LICE?lSE' ?!O. DPR-50 CHANGE f!0. 8 TO TECH!!ICAL SPECIFICATI0iS METROPOLITA.l EDISOTl CC"PA!lY THREE MILE ISLAr.D flVCLEAR STATI0tl. UtlIT 1 DOCKET fl0. 50-289 Revise Appendix B as follcws:

Remove pages 7 and 8; and insert the attached' revised pages 7 and 8.

The changed areas on the revised pages are snown by marginal lines.

1556 1.53 4

4 l

6 O

J O

~

.-w.,_

_ye.---

a i l 1

I 2.0 LI:"ITISO CCXDITICNS FOR OPERATION 2.2 Cher.ic al-

"1C)

L I!onitoring Requircecnt 2.2.1 Chierine g- ;p O

Objective Chiccti;c

gg l

The purpose of this specification is te ensurc Anc purpose or this cpecification in to g==)

that the chlorian concentretien et the plan:

limit tha disc'enrge of chlorine to levels

z y uhich are not harmful to the biota in the river water discharge is monitored in such a rav I

SUIl!

as.to accure cenpliance uith Specific: tion 2.2.1.

Suscuchenna niver.

w::;-.

sa Snecification Soccification l3;y

====--

The total chlorine concentratien shall be n:nitered The total chlorine concentration, a.

a.

reasured at the plant river diccharge, and recerded con inuclly at the plant river vr.tcr chall not exccad 0.2 ppa nnd the free diccharge and in the cooliac to car bicric-n.

chlorine component chall be less than Inntrunents ceploying the en7erer.ctric ;;incipic or in truments caploying cncther method ei equive-0.1 ppm except as discussed in b. below, lent accurncy and standardized c;ainct the nn;cre-

~,.

For one consecutive 90 day period during natric method nhall be used.

If the autern cd I

the first i co yea-of plant operation, the nonitoring equipment at the plcat river water l

total rc;idual chlorine coacentration dir: charge it out of service, an analysis fo.'

~

chlorine concentration vill *ce nede daily during

'n2:sured at the plant river discharge I

shall not encced 0.5 pym.

The starting a chicrination pariod.

The analysis ch:11 'ec dnte for this 90 day period uill be perfornal en sanples taken at 10, 30, end 3C minutes following the start of the chlorinatien selected by the Metropolitan Edicon

~

Corpcny and the Director of the Regional period.

LJ7 I

LJ7 Cperations Office notified before its hf For a temporary period not exceeding tro years, C7s cen caconent.

a reading of 1 ppm or icsc total residu21 chlorine LJ7 4

q 4%

="#

y

l i o 2.0 I,I':ITING C0: DITIC IS FOR OPERATION i

Saccification (Cent'dl Specification (Cont'd),

.The total duration of chlorine discharge in the coolin, to:ect bloudcun shall be t 't:a cs c.

to the river at levels greater than evidence that the concentratica of chlertc.:

  • 0.01 pp:t shall not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per orintuatin:; in the blo. do;;n is 0.01 pen er less in the discharge to the river.

1 urin:; t':e 5; -

- day.

day pt.riod identified in part b of S;ccification

7.1, the plaul operating staf f or their aredOS Q

shall detertaine the adequacy of the 1 pp: lirit 1

Q to r.c.nure the upper linit of 0.01 ppr in the I

D discharge to the river.

If the 1 ppr limit is 4

found inadequate, or if the plant o; craters so D

clect, the operators, hall cubmit a nc..: li-it on D

residual chlorine in the cooling teuer ble:.dcten to the /iFC Of fice o f ke;, elation f ;r cpp re e21.

,Q If the 1 ITn li:ri.t I!: found inadaquare, e neu l*d limit tunt 1.c approred by the !r.C Office of

!I

==

rD Rep,ulation within tiro yearc of the etert o f

{

eperation of the plant.

If the 1 pp" linit is u

found to be adequate, the plant operntors shall cabmit evidence of this adequacy to the X2C

, Of fice of Rcr,ulation for concurrence ni thin tvc l

.~

8 yearc of the start of operation of the plant.

1 m

CN Banen Fancs I

Q T,ced on the AEC staff revlev, including as Monitorinn residual chlorine at thr dincharr.e *

~

'.32ckgreend an evaluntion by h*lllia:a A. Brungu,*

to the river us.it at:nure cc:qliance with the I

bre tr.s, " Effects of Residual Chlorine on Aquatic I.ife," J. L'ater Pollution Centrol Teucratien, M.illin,is.

s, 2100-93-C.V.'3).

D I~'

-7 g

g

, ~ _,

bf ITED STATES NUCLEAR REGULATORY CCi"tISSICil 4

DOCKET NO. 50-289 METROPOLITAtl EDISOff COMPA lY NOTICE OF ISSUANCE OF AMEND?'ENT TO FACILITY OPERATING LICENSE Notice is hereby given that the U. S. fluclear Regulatory Ccmmission (the Commissien) has issued Amendment No. 8 to Facility Operating a

License flo. DPR-50 issued to Metropolitan Edison Ccepany which revised Technical Specifications for operation of the Three Mile Island Nuclear i

Station, Unit 1, located in Dauphin County, Pennsylvania. The amendment is effective as of its date of issuance.

The amendment provides for the chlorination testing to be ccmpleted in one consecutive 90-day period during the first two years of plant operation.

a The application for the amendment complies with the standards and requirements of the Atemic Energy Act of 1954, as ' amended (the Act), and The Commission has made apprcpriate the Commis,sion's rules and regulations.

findings as required by the Act and the Ccmmission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amend 5ent. Pricr public notice of this amendment is not required since the amendment does a

not involve a significant hazards consideration.

7 W 4' R Sfl 9s 1556 156 1

v

2 For further details with respect to this action, see (1) the applica-tion for amendment dated flay 7,1975, and (2) Amendment No. 8 to J

License No. DPR-50 with Change No. 8.

Both of these items are available for public inspection at the Commissi5n's Public Document i

Rocm,1717 H Street, N. W., Washington, D. C. and at the State Library l

of Pennsylvania, Government Publications Section, Education Building, Harrisburg, Pennsylvania.

l 1

A copy of item (2) may be cbtained upon request addressed to the

~

U. S. Nuclear Rc;ulatory Commission, Washington, D. C. 20555 Attention:

Director, Division of Reactor Licensing.

Dated at Bethesda, Maryland, this 16thday of October 1975.

FOR THE NUCLEAR REGULATORY COMMISSION m.Y l k &'

Daniel R. Muller, Assistant Director for Environmental Projects Division of Reactor Licensing S

1556 157 j

w e esee-v 4

.N--

_,_