ML19289G092
| ML19289G092 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/07/1979 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| OLP-790507, NUDOCS 7906260277 | |
| Download: ML19289G092 (6) | |
Text
t*,
M
.L
~
5/7/79 3v_3ao BKG CHRONOLOCY
//R/S March 29 Oh00 Event started with feedwater pumps tripped 0700 High activity in RC sample liner - Site emergency 0730 General emergency - high radiation in containment 1045 3 mr/hr of# site levels RC nunn IA turned on March 29 First post-event primary co o l a ri t sanale taken for isotocics (1000 R/hr on contact) - maj nr 'uel releasas indicated analvsis waste release to river of stichtiv contaminated water - terminated at NRC request (resumed on March l')
Ma r :'- il l!30 Chairman suggested evacuati,, o
,recnant women a-J r
children to State N,n-:cmde sae cas bubble id: 'i#ie f - sevore 'uel ca-ace indicated bv prima y coolant sa aie resul ts but neiting not iikelv based on isntopic ratios-NCC in',r,ed that contain ent ores:ure soike n' abou* 30 nsi,ccurred at 13E] on." a r : h 2' Jenton and cc,can" arrived at site at 2 p.
- (R3 NRC o -site),
a r : '- 71 J2gast i" redece cuuble ice.
c Firs
- contain en air sample taken 'or isotopic aral" sis r lead for shieldinc arrive in-site.
All ther-o-2 ' t,ns o coun1e be!ca saturation.
'ri' 1
Non-c,ndentable bubble size sieni#icant iv reduced.
L' x v c e n buildu^ c, clu Je J to he muc" less thcn previnuti" conservatioel" esti ated.
s,ril 4 Unit I solid waste shipned from site to Snuth Ca r71 i a.
T'ril 6 Waste gas tank vented to cn,tainment but terminated on high au<iliary building radiation readings.
RC nump 1A tripped; r
RC pump 2A started within about twn ninutes.
Venting o waste gas tanks to containment successfully resumed.
April 7 Sodium thiosulfate in sump to 'i iodine - (wo rked )
Apri' 9 Noise analysis indicates no bubble in either steam gererator, but some gas in svstem near h00* psi.
Some RC pu a vibra
- ion at I r.. (400 psi) oressures.
April 10 LT-2 pressurizer level spiking.
LT-1 observed inoperable.
Onerating on LT-3
'/ E1
' n ;!
cJl u
r Lu a -n
- 6260 m f:
g
r.
Chronology Acril 11 Second prinary coolant sample taken for iso;.
c analysis.
River water pumos for fan coolers shut down because o' leakage - later repaired.
Problems with letdown flow when pressure reduced to 42C psi.
Aoril 12 Lost LT-2 p res su r i ze r level cnanne'.
Pressure reduced to 300 osi #cr final offgassino.
A,-;!
11 Hvdrocen recomoiner trioned off.
LT-2 nack on inter-ittent!"
Boron concentrations show 3101-1520 nr,.
eCroldown o# ori arv syste initiated Sy coerinc valves t,
turbine.
noril IL Pressurized primar" coolant sarole tat ?n.
ri-st auxiliarv buildino filter removec for channeou' caril 15 A^ril if H drogen reco-biner restored tn servica.
i Aori' 10 A -11 19 i: Turbine rollea at ICJ rpm outling vacuu, --
.6, 179e r i no boil-#f te nerature and reducirg cricarv syste-temperatures.
April 20 Train A Auxilierv Buildina charcoal filter changeout comolete.
Added two gallons of hydrazine to control primary coolant oxvgen.
Deluge systen B train on aux building initiated inadvertently.
A t rain put in service.
Systen cool d own stopped at 175F, turbine turning at 250 rpm.
April 23 Recombiner placed back in operation after trip.
Acril 24 Fuel handling building filter
'A' train replaced and in service.
- Turbine tripped by operator because of water inningement resulting from transferring '!edwater flow to auxiliary feedwater nozzles.
Average c.olant tenperatu e increased to 224F.
4
)I I g r _ J' L
-)
9
=
~
Chronology
_ 3 April 25 Aux building "B" filter train changeout and put in service.
April 26 Ai r ejector monitor increased in preparing to steam on 3 S.G.
1000 and attempt terminated.
Acril 27
- o915 Pressurizer level LT-3 (las t instrument, eratic earlier) failed.
Natural Circulation successfully initiated ahead of schedule bv shutting down RC pumo 2A at 2:00 o.m.
Short release of activity observed - thougnt at first to be iodine bv TMl staff, later con #irrec as xenon.
Returned to background wi Sin L hours.
- 1600 Natural circulation on 3 1,op ceased - later concluced to be because of makeuo water addition tn 3 loop cold len.
Acril 2 SJ 110 Steaming o, 3 S.G. stoppec because of indicated inc ease in vent stack acti' tv (later eaund in be a necative readout cause1 bv cnance of cartrin :
Aoril 29 Hignest incore thermocouple readirc:
- 32CF, Su p level estimated at Si feet Sv Met /Ed (L25,0:0 gal).
Source ]f water since first dav thnoght to be feo, corn 7nent cooling svste venting losses and primar, safety valves.
Both sump puros in contair. rent inoperable
" a '. !
3HR upgrade - T.V.
cameras operable.
Mav 2 Two trains of auxiliary building suople ental filters systen.
Seal f i ms to all RC ounps reduced to 2 gpm.
Hav 3 DHR upgrade - accelerometers installed on pumps.
Heated water introduced to 5 cold laop as planned.
May 6 Third train of aux building supplemental fil ter system placed in service (b r i e fl y run 5/4 and 5/5).
cc:
V.
Stello R.
Vollmer 3.
Grires J.
Collins F. Miraglia Chronology File b
e l
?
l L'l -
J-~
' p' LJ 9
g
Oceumu ;
f-
- l ~. l, c J
p-
/
I
- n. y, e.U e
,/
3
.v on en., q v a s 7
r Ma P 2 JLO" Even: 5:a-:e wi -
eensa:e-n; ns
- noe:
D'03 H i c_ - a:*i i; i r-c' sa ::e iner - Si te e-e r ce n v.
073:
Genera. e eegen:. - "i:- radiatior i- :n-:2. ne-:
i:LT ' --/nr ns te !e"eis r-,-
nunn In turne: o-r post-even: D-inarv coolan* samcle taken *0r
. sotoolcs rtrst i
u.a r :r er
(!OCO R/n-o r. contar:I - naio- #ue: r e l e a r. e s indi cated s ' i ght I' nntaminated analvsis waste release to rive-
^#
-ate
- te-minate: at NR recues; i esu-ed on Marer 3")
- ecma-
-: en a-d
'c
- - ;^
1';
- a rma-s.;gres e: e,ca: a:
- ~ '
e-
- ^ 5:a!'
-:r-.e sa:
- s c le ider.: -
.-c
- ;e' 2at indica:e:
s --:- - :on'e - sa : t ec_
- s
_: me:
~n:
c a: :r ra -e-i.c e l - :ase c-o:: rc:: -
'. : i c
r <ssure srike a:nu: 3: rt
- .:- -: a:
--~ m ce:- : ~
e at :
(7' W.:
c : :c, Denton and cr ranv arrive: a-
.a t r
_egest ire :- renace :; r:e s c_.
r
,s
---:g:-
e - 3;-
<c--
e : c.e-
<,:c-
- e,a ' v s _
3
- ear ':- e t _ :r: ar,. -,
-3
- e.
r.
---< 0 coa 'e re'n-sa:;ratin-m.,-
s o..
s 7, _. _ - _. _, c- - ; c..-...,
m
- ys,
_-c_
_ c_
,e i _ _., e...-
Arr!' L
'J n i i solic waste s-i red '---
- a :- (n
- ^
_a-~
Ina.
r "I^'
..".r.-
a c. '. <.-. v-e-
.c.
n*<
c-*.'---
^.
aux lia-" ouild;n-edi t- 'n-erd:ncr.
~~
-'u--
- ' o e : :
R' o u -- 2 /- s t a - t e d,
"i-a>: te nin; er.
'.' e r : - : c' waste ges tanks to cnnia men-s ut:es s 'a : resumed.
' i- ;odine - (w o - k e c )
- odium th:ssulfate i-su : to A. - ! ' '
erri' 9
'o i r e ana l vris in icates nn b u t;b i e in e t:her stea-cenerator,.
out s : me ces in system near LO: 'n s i
" c-e D.
- cu: n vi: ration at l ov- (LCD ps i) pres sures.
o'se-,ed inoperaole.
- -r-;1 10 LT-2 pressurize-level s;;Ai,g.
LT '
e t -*a-j O^ era *Ing on w
p3 e e umeudsm-s 12 e g
> C, a ; v i
l-v g._
l
,,n..
1 o
as
7; oes Ar-
'1 Seco,d e-,aev :or;a-: sa-rie : a r.e n o-iso:coic anai" sis.
c Rive wa:e-oumos 'o- #ar coole 5 sne: c ae r recause c' icaiage - later repairec.
Proclens with letcown flow wher.
cressure recu:ed ::
.2 ps Ao il 12 Lost LT-2 oressurizer leve! :nanne' F-essure recuce:
- ~
300 osi for final offgassinc.
-- ' ' 1 Hearager recomoine-tripoed o'~
LT-2 cack on interri*te-l'.
B a r c-c ^.n = e r.t ra t i o n s show 3100 C30 orm
"-C oc i c ow n r# nri-ar.
syste-initiatec bv caening valves to turbine.
-r-T' iL Fressa ::e:
- i me -' coola - saro'e take-C'-s: aux
'ia-o bu;1 cine fi!:er removed fo :hanceou:
Arei l 1,c cr:
16 Lvc ocen eco-bine-r e s t r. r e : :- service.
- 7. c - :
10
- .6,
.e-
- 4. : - : '
'c
'Turtine
-!'ed c*.
' C --
nul i-r vaca;- r-
- iir :e e atu e en:
erucia; :-:-e-seste-empe :
et.
April 23 Train A Auxiliarv Buildinc charcoal filter en.a-neru
- Or:lete.
1 0-i-ars
- -'79t Accec tw ca?lrns a'
nvdrazine
!+
contrO c sgen-Celuge svstem E train er aux buiiding in: iatec inaovertentiv, e train out in service.
Svstem C0cicrwa stoppec at 1,,, r, turoine turning a
, 9 ;- rpr Acril 23 Recombiner placed back in operation after trip.
a
.n c-i i
s train repiaced an_
rar:. 1,,
.u e,. han l.eng bu.lc..ing f.lter s
service.
~
tripped bv operator because c. water iroingement c
-iuroine resul t i ng f roen trans# erring feedwater f 1 3.-
to auxiliarv feedwater no::les.
Average coolant tempereture increased to 224F.
4>
f),-
D f LJl c ~f e
9 e
~
- n o,olop~
. 3_
April 25 Aux auilding "B" filter train cnangeout and out in service.
April 26 Air ej e ctor nonitor increasec in orecaring to steam on B 5.f.
loop and attemot terminatec.
Aoril 27
- o915 Fressuricer l' eve l LT-3 (l as t instrune., eratic earlier) failec.
Natural Circulation successfully 4
initiated ahead o' schedule bv snutting coan RC pumo 2A at 2:00 p.m.
Short release o activitv f
ocserved - thouch at firt: to be ind:ne av TMI sta#f, later can'irmec as xenon.
'e!ur;ed to background within L nours.
- '6]C
- stura' circulation or 51 0 0.~
ceasec - late-conc ucec i
to oe oecause of makeup water accition to E '000 colc leg.
Aeri! 27
- 011C Steaming on 2 E.G.
stoopec cecause of indicated increase in vent stack activity (la.er founc tu be a negative reacout caused ov cnange of cartricge).
ori' 29 Hignest incore thermoccuole reading:
32CF-Es o level estima:ed at si feet oy Met /Ed (L25,000 gal).
Scurce o' water since first day thoucn: to ce ' rom component cooling Svste venting losses and primarv saferv valves.
Ec:
sa,c pumos ir ccn ainment inoperacie.
May !
OMR upgrade - T.V.
ca eras cperable.
hav 2 Two trains of auxiliary building suoplemental filte s systen.
Seal f l av to all RC oumps reouced to : gpm-Mav 3 DHR upgrade - a c c e l e r ome t e rs installed on cumps.
Heated water introducec to 5 cold loop as plannec.
May 6 Third train o# aux building supplemental filter system 5/6 and 5/5).
placed in service (o r i e fl y run cc:
V.
Stello R.
Vollmer B.
Grimes J.
Collins F.
Miraclia Chronology File O
5C1 m,
LJl
,_. / c/
e