ML19289G083
| ML19289G083 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/10/1979 |
| From: | Abraham K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Robert Carlson, Ingram F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF PUBLIC AFFAIRS (OPA) |
| References | |
| NUDOCS 7906260240 | |
| Download: ML19289G083 (3) | |
Text
Send by Rapidfax to R.C. Carlson, Region 1 and F. Ingram, PA HQ MNBB
~
To: Robert T4 Carlson, Senior Duty Of ficer, Region 1 From: Karl Abraham, PAO
Subject:
TMI News Center and Region i PAO Operations The PA0 will return to the Philadelphia area late Saturday morning.
He will leave his radio page in the Region 1 Public Affairs Office for use by j
Clyde Wisner (Region IV), who will be manning the Region 1 PA Office Monday through Wednesday, May 14-16. Abraham is taking three days ccmp time leave, and will retur-to werk Thursday morning, May 17, in Region 1.
The telephone answering machine in the TMI News Center should be tested ence each evening by calling 717/ 367-1936. If the machine is not wcrking, or if the message is incorrect, the Duty Officer should contact the Administrative Trailer at TMI (590-3970) an FTS number, or 717/ 782-3970, where the ADM staff has a key to the news center trailer and can correct the prcblem.
The recorded answer for the public will refer callers to the Region 1 PA Office during the day and to the Region 1 Duty Officer during non-working hours. Collect calls will be accepted fr om the public. The caller may be asked to give his or her nu=ber, but that is not mandatory for the call to be accepted. Please make an entry in your phone log as follows: " citizen-PAO call," so that we can later check to see how extensively this service has been used and its approximate costs.
Y Karl Abraham cc Duty Of ficer's Book PAO Regional Director Branch Chiefs TMI News Center PAO secretary (for C. Wisner)
J.J. Mc0 scar I. Sallustio F. Ingram, PA HQ (sent by separate fax) 9g 1 ~ }'
cJ l e m
7906260296 Q :-
- Seis>nzin ?943 9
s Precedure:
Independent Measurements on Radwaste Liquid Discharges Objectives: To independently measure the radioactivity concentrations in liquid radwaste discharge streams.
Background:
Unit 1 control room notifies NRC Turbine Deck - Maintenance Office of all proposed liquid releases to the river.
Since public interest is high in this crea, we are instituting a formal procedure to obtain independent measurements of the radioactivity concentrations in these discharge streams.
Requirements:
(1) An independent sample shall be drawn from every fourth discharge from each separate system or tank.
The sample an HP inspector.
shall be taken in the presence i
(2) Information on all current releases shall be obtained and maintained in a logbook at NRC Turbine Deck Office.
(3) The samples snall be taken to the Mobile Laboratory for analysis.
(4) The Mobile Laboratory personnel shall determine radio-activity concentrations in samples and transmit the results to the NRC Turbine Deck office.
(5) The results shall be compared to the licensee, entered in logbook, and a cc:ermination made whether the comparison is acceptable using criteria in MC 82745.
uJl i/O
=
m o
e
~
m e
I i
F.,
P i
'A g
G M n R
i R
O l t e
F pn A
N mi I
ao S P e1 1
E C
L e
P m
.S M
i A
T I
S
/ n e e D
t k a a DT E
i n
T o
i S
tu A
l i
W D
D A
i e
R l m au t l oo D
TV I
U n
Q e
i gl I
rG a(
L hc e s t ia 1
DR 1
0 S
e T
n g
o r
1 i
a 1
t h
E af c e
ro s M
u i
D D
E R
U S
A E
e M
g ra h
T e
c mf s i oi T
D E
D 11 E
P no E
i t
D ac N
oL I
/
me tsy S
I no i
t e at t
h
}N ^w i
c a
. U-w.
iD m'
f /
i e t m oi NT w
,j i
I!
1 e