ML19289F964

From kanterella
Jump to navigation Jump to search
Provides Summary of Activities While at TMI-2,for 790504-11. Contact W/Licensee Was Minimal
ML19289F964
Person / Time
Site: Crane 
Issue date: 05/04/1979
From: Della Ratta A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 7906210228
Download: ML19289F964 (1)


Text

%

~

i

SUMMARY

OF ACTIVITIES AT TMI FOR ARTHUR DELLA RATTA i

1.

Time of Arrival: 1030 hrs., 5/4/79 Time on Du+;y:

i 1530 hrs. to 0030 hrs., 5/4-11/79 Total : 63 hours7.291667e-4 days <br />0.0175 hours <br />1.041667e-4 weeks <br />2.39715e-5 months <br /> 2.

Summary of Activities:

During my tour of duty, I was a member or the Environmental Mobile Survey Team. Specific activities performed, as determined by current meteorologic data, included the taking of air sarples at predetc.ined off-site survey point locations and performing direct radiation surveys of the environment at all of the num5ered survey point locations

+

located on the east and west side of TMr.

3.

Due to the nature of the assigned work activities, my contact with the licensee was minimal and therefore, I have no comments regarding the licensee's operations.

4.

No comment.

242 343 somno 7 9 0 6 2 Jogag n-g

{o