Provides Summary of Activities While at TMI-2,for 790420-28. Contact W/Licensee Was Minimal
ML19289F949
Person / Time
Site: Crane 
Issue date: 05/02/1979
From: Shaub E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Grier B, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 7906210203
Download: ML19289F949 (3)


Text

-.

, n 'r e. p u n:

v -

m e

w

./

SUPMARY OF ACTIVITIES AT TMI FOR E. THOMAS SHAUB 1.

Time of A' rival :

1100 hrs., 4/20/79 Time o.7 Duty:

a.

1100 hrs. - 0030 hrs., 4/20/79 b.

1500 hrs. - 2400 hrs., 4/21/79 c.

1430 hrs. - 0030 hrs., 4/22/79 d.

1430 hrs. - 0030 hrs., 4/23/79 e.

1400 hrs. - 003C hrs., 4/24/79 f.

1430 hrs. - 0030 hrs., 4/25/79 g.

1400 hrs. - 0030 hrs., 4/27/79 h.

1330 hrs. - 0030 hrs., 4/28/79 Total:

76 hours8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> Time of Departure:

1030 hrs., 4/28/79 2.

Sumary of Activities:

While on duty, I was a member of the Environmental Mobile Survey Team.

Specific activities included taking air samples at various off-site locations as determined by meteorologic data, taking vegetation samples, and performing direct radiation surveys of the environment.

3.

Due to the natu.'e of the work activities, my cont:.ct with the licensee was minimal. Therefore, I have no comments regarding licensee operations.

4.

No comment.

i90621 ops getsr1etN 71-9 %

24231J l'

b

'b

SUMMARY

OF ACTIVITIES AT TMI FOR E. THOMAS SHAUB 1.

Time of Arrival: 0830 hrs., 5/2/79 Time on Cuty:

a.

0830 hrs. to 1730 hrs., 5/2/79 b.

0700 hrs. to 1830 hrs., 5/3/79 c.

0700 hrs. to 1830 hrs., S/4/79 d.

0700 hrs. to 2000 hrs., 5/5/79 Total:

45 hrs.

Time of Departure:

1000 hrs., 5/6/79 2.

Summary of Activities:

While on duty, I was assigned to work in the NRC Equipment Van.

Duties consisted of equipment repair, equipment modifications, miscellaneous errands for parts and supplies and assisting the NRC Mobile Lab whenever necessary.

3.

Due to the nature of the work activities, my contact with the licensee was minimal.

Therefore, I have no comments. regarding licensee operations.

4 No cor.=ent.

f 24231f

h

~

SUMMARY

OF ACTIVITIES AT TMI FOR GREGORY C. SMITH 1.

Time of Arrival:

1000 hrs., 4/26/79 Time on Duty:

a.

1000 hrs to 1800 hrs., 4/26/79 b.

0700 hrs. to 2000 hrs., 4/27/79 c.

0700 hrs. to 1600 hrs., 4/28-5/4/79 Total :

83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> Time of Ceparture: 0800 :.*s., 5/5/79 2.

Summary of Activities:

While on duty, I was a member of the Environmental Mobile Survey Team. Specific activities included taking air samples at various off-site locations as datermined by meteorologic data, taking vegetation samples, and performing direct radiation surveys of the environment.

3.

Due to the nature of the work activities, my contact with the licensee was minimal. Therefore, I have no comment: regarding licensee operations.

4 No comment.