ML19289F927
| ML19289F927 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/17/1979 |
| From: | Mcgaughy R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 7906210160 | |
| Download: ML19289F927 (1) | |
Text
,
I
/c'e*
- 8 C v%
~
UNITED STA1LS
,g NUCLE AR REGUL ATORY COY *,11SSION
- s v
REGICN 1
.: I ;
e
-f,.-
l sai nau avenut y, ' %.- [.
?V f
,aso or ca ussies pt s as v t v a,u 9:6 t
c May 17, 1979
- 'EMORXQCi FCR :
NRC Cperations Inspectors FRCMi R. W. McGaughy, Chief, IE Resident Office SU3 JECT:
HEALTF. Im? SICS COVEFlGE OF 0.FFATIC' S Refercnce:
SOP :0. :-93, Reactor 5 d iding Su=p Level ':c asurement The referenced procedure was intended to require cove rage b;. licensee
' '. thou gh t e l e t e c t or readings were ta<en as health physics perscnnel.
required by the procedure, it accears th at licensee HP persennel were not involved nor aware that the procedure was being carried eut.
One result of this is that current radiation levels in the area are now are not available apparently increased and adequate HP suriey results to docu ent when and hcw the increases occurred.
Health rhysics consideraticns are and will rcrain an important part of all activities.
Operations inspecters, in additica to atte pting
'~'
to ensure that procedural requirements including HP requirenents are carried cut, Aculd rcurinely u.for= the ';RC in plant HF a<.rsonnel en sh-ft of all significant activities in the plant.
m f/
,hj'/';'2lf e
ii i
R. W. McGaugh/, Chief IE Resic'ent Office cc:
G. Smith D. Haverkg=p 7 9 0 6 2 otta l
6,,0lGriel 9 -W 242 278
--