ML19289F926
| ML19289F926 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/15/1979 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Neely D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 7906210158 | |
| Download: ML19289F926 (2) | |
Text
'
I*
+ y a'c g \\,
UNITED sTATts NUCLEAR REGULATORY COMMISSION
+
- .lb
- Q,i e
REGION I
- N I N ['< l
- 63) PARK AVENUE q, fp f
a xmc o r ea ussi A. *E n ssv v. A NI A '9406 May 15,1979 MEMORANDDI FOR:
D.
Neely, Chief, In-Plant HP Inspector FRCM:
J.
P. Stchr, Acting Director, TMI IE HP
SUBJECT:
TML RAD WASTE SHIFM.ENTS Eackground:
It is my understanding that the licensee's procedures require that an on-site IE HP be notified prior to each rad waste shipment.
It is also my understanding that NECo coordinates rad waste shipments for Met Ed.
For infor~ation on shipments to Richland the NECo contact is Frank DeMet (509-377-2411).
For information on shipments to Barnwell the NEco centact is Ray 1,ambert (606-7c4-6611).
In several instances we have been requested to provide certain infor.ation on these shiptents, both prior to and after the fact.
Also there is con-siderable public interest in this area.
/
d n'ith the change in ou-in-plant HP organization, now is a good time to formalize somewhat our procedures for routine inspection coverage, including independent ceasurements in this area.
getion Recuired 1.
Make sure we obtain f or each shipcent, prior to its leaving the site, information on:
a.
contents b.
type of packaging c.
transport company d.
destination e.
ECo shipment coordinator 2.
inform the Office of State Programs (OSP) of the infor.atien in item 1 prior to the shipment leaving the site.
The OSP contact is W. Kerr (FTS 492-7767; Home 301-762-0199).
(OSP cay then contact the designated NECo contact for information on the exact routing and location of the shipment at any ti=e.
OSP will also inform interested states and NRC Congressional A". airs, if requested.)
7 9 0 6 2 lot 93 PmsMn,)
dg
,42 2/.p z
t
. ~..
D. 'ieely I'ay 15, 197 9 3.
Visibly inspect the shipment and take independent surveys to ensure the licensee cceplies with the applicable trancport requirements.
/
J U
..'. at
.r, Act ng Director
B.
H. Grir.r G. H.
Scich J. Sniezek J. Collins W.
Kerr, CSP w
w d
242 27'_
9