Text
5.8 O
May 3, 1979 SMOMNDUM FOR:
IE Control Room Personnel r.4CM:
IE Trailer #8 5k%h SU3 JECT:
PERIODIC Il!STRUMENT READINGS Readings should be taken and transmitted as follows:
A.
Everv Hour
- Reading Transmission Wind Direction Call in all readings to enviren:. ental Wind Speed monitoring personnel in IE trailer #8 every hour.
HPR 219 Monitor **
Stack Flow Iodine Cas Particulate V-5 Monitor **
Supply Duct Flew Iodine Gas Particulate AM-1 Mo ni t o r*
Filter Train Flow Iodine Gas Particulate
- When Trains 3 and 4 of the new auxiliary building roof venti-lation system become operational, readings of Filter Train Flow, Iodine, Cas and Particula te for monitors AM-3 and AM-4 will be added to this list.
- Please notify IE environmental mor t*oring parsonnel in trailer
- 8 whenever filter train alignmen.s change and when the MUT temperature or level are being changed since these activities affect releases from the plant.
Also notify these personnel whenever effluent =onitors alarm.
790621cm guse 7Me 242 26.7
~
r
uom?
8 IE Control Room Personnel 2
3.
Every 3 Hours (first one each day at 0300 and last one at 2400)
Transmission Reading If NRR Trailer #7 is manned, call in Pressurizer Pressure Pressurizer Temperature readings every 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. When it is un-Pressurizer Level manned, provide a copy of the data sheet and T t Trailer #7 and #8 at end of shift.
RC Loop A Th c
RC Loop 3 T nd T h
c OTSG A T s OTSG B T s Containment Pressure Selected TCs C.
Every 24 Hours G 0500 Readine Transmission Complete TC List If NRR Trailer #7 is manned, call in readings. When it is unmanned, provide a copy of the computer printout to Trailers
- 7 and 8 at end of shift.
m
_-