ML19289F838
| ML19289F838 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/03/1979 |
| From: | Brown R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-SSINS-8210, TASK-TF, TASK-TMM NUDOCS 7906200393 | |
| Download: ML19289F838 (1) | |
Text
-
pmRfCo UNITED STATES
'o NUCLEAR REGULATORY COMMISSION
>7 -
%g 4
m / _ q,n 0
3,f e
R EGION 11 JL WJ 101 M ARIETTA STR EET. N.W.
{,
^
ggff AT1.ANTA, GEORGI A 30303 j
s v
s
- ,iAY 0 31979 SSINS 8210 MEMORANDUM FOR:
Soyce H. Grier, Director, Region I FROM-Robert A. Brown, Radiation Specialist, Fuel Facilities and Materials Safety Section, FFSMS 3 ranch, Region II SU3 JECT:
REPORT OF ACTIVITIES AT TFREE MILE ISLA'!D 1.
Arrived at TMI Site:
1100, 4/12/79 Departed TMI Site:
0030, 4/27/79 Times on Duty:
Midnight to 8:00 a.m.
shift with 74 hours8.564815e-4 days <br />0.0206 hours <br />1.223545e-4 weeks <br />2.8157e-5 months <br /> overtime 2.
Su=ary of Activities Pe-ned:
Tour of duty was spent on ey Team. Work coasisted of Environmental Monitm in/
u performing off-sitt radiation level Surveys and the taking of air samples in the vicinity of TMI.
Also spent time collecting sample results from NRC, RMC, and SAI =obile laboratories.
3.
Comments on Licensee Operations:
I had no real contact with licensee personnel other than RMC cnd SAI technicians.
If it's not already being done, the licensee should consider looking into RMC and SAI sample analysis results.
Procedures and calculations should be looked at closely before using sample results for important health physics activities.
4 Co=ents on IE/NRC Operations: Altogether, I felt the NRC operation at TMI was quite thorough and professional.
/
I
/
Robe-
/3rown y
Radi ion Specialist Fuel Facilities and Materials Safety Section cc:
J. P. Potter, RII CONTACT:
R. A. Brown 242-5505
,2 3 /
d<
7r n
c caw 99 PS 7906200778
.