ML19289F202

From kanterella
Jump to navigation Jump to search
Raises Questions Re SECY-78-623 on Reactor Pipe Cracks
ML19289F202
Person / Time
Issue date: 02/06/1979
From: Bradford P
NRC COMMISSION (OCM)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19289F196 List:
References
SECY-78-623, NUDOCS 7906040403
Download: ML19289F202 (1)


Text

pf"%

UNITED STATES 7

f,

".bt NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 k[N /

February 6,1979 c

OFHCE OF THE co.t.ussiou t a iEMOPANDUM FOR:

Harold Denton, Director Office gclear Reactor Regulation FROM:

Peter A. Bradford

SUBJECT:

INFDRt% TION REPCRT ON REACTOR PIPE CRACKS (SECY-78-623)

I have several questions about this SECY paper:

1.

The staff concludes on page 21 that the "non-destructive examination methods currently used for inspecting piping and BWR's have been demonstrated to be effective in locating cracks prior to these cracks propagating through the pipe wall."

How can UT and RT tests he called effective when RT detected only one of eight indications.

of pipe cracks and U1 detected five of eight at Duane Arnold?

2.

Page lE says that the 1975 NRC report recommends replacement only where unacceptable defects were found.

What are unacceptable defects?

3.

In the staff report there is no discussion of Comey's assertions that containment radiation monitors frequently record valve leaks, so a leaking pipe might be ignored.

L' hat is the staff analysis of this point?

cc:

Chairman Her.drie Commissioner Gilinsky Ccmmissior.er Kennedy Commissioner Ahearne 2235 316 S. J. Chilk, SECY 7906040 /0 3 l