QA Program Insp Rept 99900033/79-01 on 790116-19. Noncompliance Noted:Total & Halogen Content of Liquid Penetrant Could Not Be Verified & Performance of Production Gas Tungsten Arc Welding Not Consistent W/Specification
ML19289E038
Person / Time
Issue date: 01/26/1979
From: Ellershaw L, Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19289E034 List:
References
REF-QA-99900033 NUDOCS 7903210403
Download: ML19289E038 (6)


Text

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.

999C0033/79-01 Program No.

51300 Company:

Westinghouse Electric Corporation Electro Mechanical Division Cheswick Avenue Cheswick, Pennsylvania 15024 Inspection Conducted: January 16-19, 1979

\\

Lv O

Inspector:

./

t' f4 Y (119 !, u )

/ A, 7/

L.( E. Eilersnaw, Contractor Inspector, Vendor

/ Da te' Inspection Branch

/ o Approved by: / Oce

/ 4 '/7 2 D. M. Hunnicutt, Chief, ComponentsSection II, Date Vendor Inspection Branch Summary Inspection conducted January 16-19, 1979 (99900033/79-01).

Areas Inspected:

Implementation of 10 CFR 50 Appendix B Criteria, and applicable codes and standards including: previous inspection findings; nonconformances and corrective action; joint fitup and welding; special welding applications, and liquid penetrant examination.

The inspection involved twenty-three (23) inspector-hours on site.

Results:

In the five (5) areas inspected, two (2) deviations from ccanitment were identified.

Devi ation:

Liquid Penetrant Examination - it could not be verified that tne total sulfur and halogen content of the liquid penetrant in use did not exceed 1" by weight, which is contrary to Criterion IX of Appendix B to 10 CFR 50 (Enclosure, Item A.), Joint Fitup and Welding - performance of production gas tungsten arc welding not consistent with the requirements of the applicable weld procedure specification and Criterion V of Appendix B to 10 CFR 50 (Enclosure, Item B.).

790321c4o3

2-DETAILS SECTION (Prepared by L. E. Ellershaw)

A.

Persons Ccntacted R. A. Asselta, Quality Assurance Engineer K. Gess, Quality Assurance Engineer M. L. Harseman, Manager, Naval Nuclear QA Engineering R. Itoh, Weld Engineer R. J. Martin, Weld Foreman G. J. Pribicko, Weld Engineer F. Ruyak, Foreman T. Stagnitta, NDE Level III, Quality Assurance Engineer B.

Action on Previous Insoection Findings 1.

(Closed) Deviation A. (Report No. 78-01):

This item dealt with certain nonconforming parts not being identified, segregated, nor placed in a holding area.

Westinghouse Electric Corporation, Electro Mechanical Division (W-EMD) has implemented their committed corrective action in that observation of nonconforming parts revealed that such parts were identified and segregated.

2.

(Closed) Deviation B. (Report No. 73-01):

This item dealt with parts not being tagged with Hold Tags af ter their conditional releases (CRs) had expired.

W-EMD has implemented their ccmmitted corrective action in that a review of the conditional r, :ase log revealed that no CRs had expired.

3.

(Closed) Deviation C. (Report No. 78-01):

This item dealt with unauthorized changes in calibration frequencies of certain calibration equipment by Gage Room personnel which resulted in certain equipment being overdue for calibration.

W-EMD has implemented their committed corrective action in that a review of calibration equipment and their respective records, revealed that the frequencies were as required and no equipment was found to be out of calibration.

4.

(Closed) Deviation D. (Report No. 78-01):

This item dealt with unidentified bare filler rods (stellite 6) being stored in the Weld material storage area rather than being scrapped.

W-EMD has implemented their committed corrective action in that observation of weld material storage areas revealed that all material was identified in accordance with applicable procedures.

5.

(Closed) Deviation E. (Report No. 73-01):

This item dealt with W-EMD establishing visual examination acceptance criteria which was less than the required Jaeger 1.

W-EMD has implemented their committed corrective action in that acceptance criteria was revised to reflect equivalency to Jaeger 1, and all inspection personnel were re-examined to the new criterit.

C.

Nonconformances and Corrective Action 1.

Cbjectives The objectives of this area of the inspection were to verify that W-EMD had implemented the requirements for the control of nonconformances and corrective action in accordance with the QA Manual and applicable NRC and ASME Code requirements.

2.

Method of Accomolishment The preceding objectives were acccmplished by:

Review of QA Manual Section C15.1, " Nonconforming Material",

a.

revision 4.

b.

Review of QA Manual Section C16.1, " Corrective Action",

revision 5.

Review of Material Review Reports (MRRs) and Corrective c.

Action Requests (CARS).

d.

Observation of nonconforming material to assure identification.

Discussions with cognizant personnel.

e.

3.

Findincs a.

Deviation From Commitments None.

b.

Unresolved Item None.

4_

D.

Liquid Penetrant Examination 1.

Objectives _

The objectives of this area of the inspection were to verify that W-EMD had implemented the requirements for the control of liquid penetrent examination in accordance with the QA Manual and applicable NRC and ASME Code requirements.

2.

tiethod of Accomolishment The preceding objectives were accomplished by:

a.

Review of QA Manual Section C10, " Examination, Tests and

?" nections", revision 3.

b.

Observation of in-process liquid penetrant examinations and verification for compliance to the parameters of the liquid penatrant procedure.

c.

Review certifications of liquid penetrant, developer, and remover.

d.

Discussions with cognizant personnel.

3.

Findings a.

Deviation Fron Commitment See Enclosure, Item A.

b.

Unresolved Item None.

E.

Soecial Welding Aorlication (Hardfacinc) 1.

Objectives The objectives of this area of the inspection were to verify that W-EMD had implemented tne requirements for the centrol of special welding application; i.e., Plasma Arc Welding (PAW), in accordan 2 with the QA Manual and applicable NRC and ASME Code requirements.

2.

Method of Acccmolishment The preceding objectives were accomplished by:

a.

Review of QA Manual Section C9.2, " Control of Welding and Brazing", revision 3.

b.

Observation of in-process automatic PAW.

c.

Review of PAW weld procedure specification 82142PU514, revision C and its procedure qualification record, number 42008.

d.

Verifying calibration of automatic welding equipment; e.g.,

ammeters and voltmeters.

e.

Discussions with cognizant personnel.

3.

Findings a.

Deviation From Commitment None.

b.

Unresolved Item None.

F.

Joint Fitup and Welding 1.

Objectives The objectives of this area of the inspection were to verify that W-EMD had implemented the requirements for the control of joint fitup and welding in accordance with the QA Manual and applicable NRC and ASME Code requirements.

2.

Method of Accomplishment The preceding objectives were acccmplished by:

a.

Review of QA Manual Section C9.2, " Control of Welding and Brazing", revision 3.

b.

Observation of in-process, manual gas tungsten arc welding (GTAW).

c.

Review of GTAW weld procedure specification 82127 PQOC6, revision F and its supporting procedure qualification record, number 9340064G02, being used in b. above.

d.

Discussic:.: Nith cognizant personnel.

. 3.

Findinqs a.

Deviation Frem Commitment See Enclosure, Item 3.

b.

Unresolved Item None.

G.

Exit Interview A meeting was conducted with the following management representatives at the conclusion of this inspection on January 19, 1979.

C. E. Anthony, General Manager R. A. Asselta, Quality Assurance Engineer F. Meledandri, Jr., Manager, Quality Control Operations J. F. Phillips, Manager, Product Assurance E. A. Tomasko, Manager, QA Engineering The scope and findings of this inspection were summarized. Management acknowledged the statements relative to the findings.