ML19289D880
| ML19289D880 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/09/1979 |
| From: | Whitmer C GEORGIA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7903190308 | |
| Download: ML19289D880 (1) | |
Text
Cc(step.i l%we f Cr,tfiti,efiy sKt() l*r:,it f arve. ',t s. f
[h i',8 ()!'.t a l ',a 4
,-l',
A!!.in'.i (..
- yi.9 a U; I
$(*ll]pNbt >V IG ' k ) l #l ' $)It s0 m
Georgia Power Chas. T. Whitmt r vxc hw. w 'a
[r)g in(. (,'f ir ig I' *
'.l''f
March 9, 1979 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-321 OPElb\\TINC LICENSE DPR-57 EDWIN 1. HATCll NUCLEAR PLA :T U :IT 1 FIRE PROTECTIO : CO:OtIT>1ENTS Centlemen:
By our letter of November 16, 1978, Georgia Power Company provided the Commission with a procedure for "Shutdeun from Outside Control Room" to be used to bring the reactor to cold shutdown in the event of a fire in the cabic spreading room.
Georgia Power Company hereby amends eur previous letter to state that the above procedure f or Unit 1 is an interim procedure.
A design change will be implemented for Unit 1 which will make the procedure for shutdown from outside the control room similar to cha t used on Unit 2.
This design will use disconnect switches where necessary to isolate motor control centers and switch gear from spurious signal-in the event of a postulated cabic spreading roem fire.
We expect design modifications will be complete prior to the end of our 1979 refueling outage.
Yours very truly,
~
x f
Q )1{ /*A,\\,
l l
-~
nw
~e
,/
Chas. F. Whitmer RDB/mb xc: 11r. Ruble A. Thomas George F. Trowbridge, Esquire 790319036
.