ML19289D880

From kanterella
Jump to navigation Jump to search
Amends to State That Unit Shutdown from Outside Control Room in Event of a Fire Is an Interim Procedure. Design Mods Will Be Completed Before End of 1979 Refueling Outage
ML19289D880
Person / Time
Site: Hatch 
Issue date: 03/09/1979
From: Whitmer C
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7903190308
Download: ML19289D880 (1)


Text

Cc(step.i l%we f Cr,tfiti,efiy sKt() l*r:,it f arve. ',t s. f

[h i',8 ()!'.t a l ',a 4

,-l',

A!!.in'.i (..

  • yi.9 a U; I

$(*ll]pNbt >V IG ' k ) l #l ' $)It s0 m

Georgia Power Chas. T. Whitmt r vxc hw. w 'a

[r)g in(. (,'f ir ig I' *

'.l''f

March 9, 1979 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKET 50-321 OPElb\\TINC LICENSE DPR-57 EDWIN 1. HATCll NUCLEAR PLA :T U :IT 1 FIRE PROTECTIO : CO:OtIT>1ENTS Centlemen:

By our letter of November 16, 1978, Georgia Power Company provided the Commission with a procedure for "Shutdeun from Outside Control Room" to be used to bring the reactor to cold shutdown in the event of a fire in the cabic spreading room.

Georgia Power Company hereby amends eur previous letter to state that the above procedure f or Unit 1 is an interim procedure.

A design change will be implemented for Unit 1 which will make the procedure for shutdown from outside the control room similar to cha t used on Unit 2.

This design will use disconnect switches where necessary to isolate motor control centers and switch gear from spurious signal-in the event of a postulated cabic spreading roem fire.

We expect design modifications will be complete prior to the end of our 1979 refueling outage.

Yours very truly,

~

x f

Q )1{ /*A,\\,

l l

-~

nw

~e

,/

Chas. F. Whitmer RDB/mb xc: 11r. Ruble A. Thomas George F. Trowbridge, Esquire 790319036

.