OPERATING DATA REPORT DOCKET NO.
50-344 DATE 3-07-79_
COMPLETED BY G.
G.
Bair TELEPilONE 503/556-3713 Ext. 234 OPERATING STATUS Notes
- 1. Unit Name:
Trojan Nuclear Plant
, 2. Reporting Period: February, 1979 3411
- 3. Licensed Thermal Power (MWt):
1216
- 4. Nameplate Rating (Gross MWe):
1130
- 5. Design Electrica! Rating (Net MWe):
1122
- 6. Maximum Dependab!e Capacity tGross MWe):
1080
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumulative 672 1416 21864 i1. liours In Reporting Period 672 1398.6 12521
- 12. Number Of liours Reactor Was Critical 0
8.9 2171.8
- 13. Reactor Reserve Shutdown flours
'4. Ilours Generator On Line 672 1370.6 11911.0
- 15. Unit Restne Shutdown flours 0
0.5 1508.7 2291162 4541673 36480892
- 16. Gross Thermal Energy Generated (MWil) 759770 1500970 11951740
- 17. Gross Electrical Energy Generated (MWil) 727976 1434001 11200600
- 18. Net Electrical Energy Generated (MWil) 100.0 96.8 54.5
- 19. Unit Senice Factor
- 20. Unit Availability Factor 100.0 96.8 61.4
- 21. Unit Capacity Factor (Using MDC Net) 100.3 93.8 47.5 95.9 89.6 45.3
- 22. Unit Capacity Factor (Using DER Net) 0 0.9 36.4
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:
18-month technical specification surveillance; April 15, 1979; 30 days
/
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITI A L CRITICA LITY NA NA INITI AL ELEClRICITY NA NA-COMM ERCI A L OPER ATION NA NA The unit capacity factor based upon maximum dependable output is above 100% due to cold weather improvement of condenser vacuum.
(9/77) 79031902d
o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-344 UNIT Trojan 3-07-79 DATE COMPLETED BY G. G. Bair 503/556-3713 TELEPilONE Extension 234 February, 1979 MONT11 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1083 g7 1091 1082 1090 y
gg 3
1080 39 1089 1079 1088 4
20 5
1078 21 1089 1078 1091 6
22 1080 1085 7
3 1086 1085 8
24 1077 9
25 1081 I
1081 10 26 1081 1082
,g 3
12 1079 1086 28 13 1082 29 NA 1080 14 30 NA
^
15 31 16 1083 INSTRUCTIONS On this format. list the average daily unit power !cvelin MWe Net for each day in the reporting month. Compute to the nearest whole megaw.nt.
(9/77)
s 6
50-344 4:
DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Troian DATE 3-07-79 COMPLETED BY G. G. Bair REPORT MONT11 February, 1979 TELEPlf0NE 503/556-3713 Ext. 234 i
c
~
Cause & Corrective
.*EE Licensee E-r Em 50
'E Event
$i No.
Date jj k
)j$
Action to jE 5 ijj g Report a t'n U 5V Prevent Recurrence H
e v
Q NA 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Ad minist rative 5
G-Operational Error (Explain)
Exhibit !- Same Source (9/77) 11-01her (Explain)
DOCKET NO:
50-344 DATE:
3-07-79 COMPLETED BY:
G. G. Bair TELPEHONE:
503/556-3713 Ext. 234 SM MARY OF OPERATING EXPERIENCE OPERATION:
The month began and ended with the plant at full power having operated continuously throughout the month. On February 1, during rod movement verification tests, Control Bank A, Group 1 failed to move due to a bad phase regulation card for stationary coils.
The card was replaced and the problem was corrected.
MAJOR SAFETY-RELATED MAINTENANCE: Work continued on the installation of new (13.3" center) spent fuel racks. Work continued on improvement modifi-cations to the plant security and fire systems.
The "A" residual heat removal pump seals were replaced.
LICENSE CRANGES: Amendment 36, LCR-16, LCA-44, incorporates a change to the surveillance test requirements for the auxiliary feedwater pump discharge pressure and clarifies the Control Room emergency ventilation preheater testing.
Amendment 37, LCR-77-03, LCA-33, incorporates a change to Technical Specifi-cations for the applicability of snubbers and pipe restraints and their testing requirements.
Amendment 38, LCR-78-10, LCA-47, incorporates the revised Security Plan into the plant 11.ense.
MISCELLANEOUS: On February 2, it was determined that 37 of the 58 flux mapping system thimble tubes had developed crud blockages that made insertion of the movable fission detector impossible. Only detectors C and E paths were consistently usable. The blocked thimbles were cleaned out with a brass wire brush and 36 of the 37 blocked thimbles were returned to service.
The installation of an additional air compressor for plant instrument and service air requirements was completed.