ML19289D779
| ML19289D779 | |
| Person / Time | |
|---|---|
| Issue date: | 01/31/1979 |
| From: | Boyle R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Levine S, Minogue R, Ryan R NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES), NRC OFFICE OF STANDARDS DEVELOPMENT, NRC OFFICE OF STATE PROGRAMS (OSP) |
| References | |
| REF-WM-7 NUDOCS 7903140384 | |
| Download: ML19289D779 (3) | |
Text
w m '7 PDR JAN E ' '579 DISTRIBUTION LIST FOR MEMO DATED R. B. Minogue S. Levine R. G. Ryan J. B. Martin I. C. Roberts L. Beraton R. Hoffman E. O' Donnell T. Nicholson P. Costanzi E. Conti J. Hickey P. Comella R. Bernero C. Nilson K. Steyer P. McGrath R. Budnitz C. Bishop T. Johnson J. Davis J. Malaro I
M. Bell J. Bunting HLTWB Staff 8
790g1403%f
8 f
UN7TED STATES
[y,
NUCLEAR REGULATORY COMMISSION 5 3' A j
WASHINGTON, D. C. 20555 O &"L/j r-)
JAN h~ TIE MEMORANDUM FOR:
Those on the Attached List FROM:
Regis R. Boyle High-Level and Transuranic Wasta Branch
SUBJECT:
FORTHCOMING MEETING WITH DOE ON GEOLOGIC REPOSITORIES On January 24, 1979, I informed you that a meeting would be held on Tuesday, February 6, with the U. S. Department of Energy on geologic repositories.
A tentative agenda for the meeting is attached.
Please note that the meeting will begin at 9:00 a.m.,
and will last the entire day.
The location of the meeting will-be the Germantown Auditorium.
$m7Y sr4m Regis R. Boyle ~
High-Level and "ransuranic Waste Branch
Enclosure:
As stated
Y
_ AGENDA FOR FEBRUARY 6 MEETING DOE Introduction (S, Meyers. DOE) 9:00 - 9:15 RJTS program objectives, organization, and history the role of ONWI ONWI Introduction (M. Kehnenuyi, ONWI) 9:15 - 10:45 ONWI Objectives & internal organization Technical Program Plan Break 10:45 - 11:00 ONWI Technical Studies Program & Systems Analysis (W. Pardue, ONWI) 11:00 - 11:20 Engineering Development (S. Basham, ONWI) 11':20 - 11:40 Technology Development (W. Carbiener, ONWI) 11:40 - 12:00 Lunch 12:00 - 1:00 Geologic Exploration (R. Laugh'on, ONWI) 1:00 - 1:20 Facilities Engineering (S. Matthews) 1:20 - 1:40 Site Qualification & Licensing (W. Hewitt, ONWI) 1:40 - 2:00 i
Overview of Projects WIPP (D. Schueler, DOE) 2:00 - 2:45 Break 2:45 - 3:00 NTS (D. Vieth,~ DOE) 3:00 - 3:45 BWIP (D. Vieth. DOE) 3:45 - 4:30 Proposed Future Meetings (M. Kehnemuyi, ONWI) 4:30 - 4:45 Concluding Remarks 4:45 - 5:00 (Note: Speakers are subject to change) ao