ML19289D756

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 8 to License NPF-2
ML19289D756
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/13/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19289D754 List:
References
NUDOCS 7903140332
Download: ML19289D756 (3)


Text

.

l 7590-01 UNITED STATES HUCLEAR REGULATORY COMMISSION DOCKET NO. 50-348 ALABAMA POWER COMPANY JOSEPH M. FARLEY HUCLEAR PLANT, UNIT 1 NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 8 to Facility Operating License No. NPF-2, issued to the Alabama Power Company which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit 1 (the facility) located in Houston County, Alabama.

The amendment was effective as of its date of issuance.

The amendment revises the Technical Specifications relating to the fuel rod bow penalty for 17x17 fuel, tha surveillance of ECCS subsystems (high pressure and low pressure safety injection),

administrative changes to the description of the spent fuel storage facility, use of quarter-core flur. maps for excore neutron flux detection system calibration, secondary water chemistry, and changing the pressurizer heatup rate.

The amendment also adds a license condition to implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation.

7 90314 0 ~3'$$2' O

6 7590-01 The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the applications for amendment dated November 4 and December 14, 1977 and August 9,1978,(2) Amendment No. 8 to License No. NPF-2, and (3) the Commission's related Safety Evaluation. These items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D. C. and at the George S. Houston Memorial Library, 212 W. Vurdeshaw Street, Dothan, Alabama 36301.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention: Director, Division of Operating Reactors.

l.,

3 4

7590-01 Dated at Bethesda, ffaryland, this 13th day of February,1979.

FORTHEf1LEARREGULATORYCOMMISSION

]-

hgj.gt'd'ldG A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

--. _ _...