ML19289C816
| ML19289C816 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 01/08/1979 |
| From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7901250229 | |
| Download: ML19289C816 (4) | |
Text
[pn stags,t
/
UNITED ST ATES
~
NUCLEAR REGULATORY COMM!sS.ON yw
, _, '..D WASHINGTON, D. C. 20555 c.
,/
g, v
JAN 8 $79 MEMORANDUM FOR:
D. G. Eisenhut, Acting Assistant Director for Systems ana Projects, Division of Operating Reactors FROM:
C. I. Grimes, Task Manager A-7
SUBJECT:
FORTHCOMING MEETING WITH REPRESENTATIVES OF THE MARX I OWNERS GROUP DATE & TIME:
Manday, January 22, 1979 2:00 pm Tuesday, January 23, 1979 8:30 am Wednesday, January 24, 1979 8:30 am LOCATION:
San Jose, CA 1/22/79 GE Pruneyard Towers ~
1/23-24/79 Hyatt House PURPOSE:
To discuss the 4%rk I Long Term Program Load Definition Report and related issues. A pro-posed agenda is attached.
ATTENDEES:
NRC - C. Grimes, J. Fair, J. Kudrick, N. Su BNL - G. Maise, J. Ranlet, R. Kosson, C. Tung, C. Economos, A. Sonin (MIT), G. Biankowski (Princeton)
GE - B. Buchholz, L. Steinert, et. al.
Mark I Owners - TRC Representatives EPRI - C. Sullivan, et. al.
LLL - E. McCauley, et. al.
$MMX C. Grimes Task i% nager A-7
Enclosure:
As stated cc: see page 2 7901g59 g
PROPOSED AGENDA January 22, 1979 2:00 - 7r00 pm Discussion of two and three dimensional pool swell test results 1.
20/3D data comparisons 2.
three dimensional effects 3.
test facility configurational differences 4.
effects of vent system orificing 5.
vent flow distributions 6.
pressure integration methodology January 23, 1979 I.
General Program Status Summary 1.
Schedule for submittal of outstanding reports.
2.
Implementation of LDR and plant-unique, analysis content.
3.
Methods for resolution of NRC questions and conr.ents.
II. Ongoing program issues 1.
Downcomer submergence -thermal stratification 2.
FSTF application methodology 3.
Fluid - structure interaction effects 4.
Load definition error and uncertainty III. SRV Discharge Loads 1.
Quencher parametric testing
- a. l/4 scale test results
- b. scaling considerations (NEDC 23713) 2.
Monticello quencher test results 3.
Bubble phasing 4.
Pool temperature limits for quencher 5.
Monticello mixing test results.
IV. Detailed discussion of NRC/ consultant questions and comments on Mark I Load Definition Report (NEDO 21888).
January 24, 1978 Continuation of MRC/ consultant questions and comments on Mark I Load Definition Report.
-