ML19289C809
| ML19289C809 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/08/1979 |
| From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7901250220 | |
| Download: ML19289C809 (4) | |
Text
,
~
umiso stares yK 1
NUCLEAR REGULATORY COMMISSION Qs$)ffl 2 !TC E
WASHING TON, D. C. 20555 JAN 8 1979 MEMORANDUM FOR:
D. G. Eisenhut, Acting Assistant Director for Systems and Projects, Division of Operating Reactors FROM:
C. I. Grimes, Task Manager A-7
SUBJECT:
FORTHCOMING MEETING WITH REPRESENTATIVES OF THE MARK I OWNERS GROUP DATE & TIME:
Monday, January 22, 1979 2:00 pm Tuesday, January 23, 1979 8:30 am Wednesday, January 24, 1979 8:30 am LOCATION:
San Jose, CA 1/22/79 GE Pruneyard Towers ~
1/23-24/79 Hyatt House PURPOSE:
To discuss the Mark I Long Term Program Load Definition Report and related issues. A pro-posed agenda is attached.
ATTENDEES:
NRC - C. Grimes, J. Fair, J. Kudrick, N. Su BNL - G. Maise, J. Ranlet, R. Kosson, C. Tung, C. Economos, A. Sonin (MIT), G. Bienkowski (Princeton)
GE - B. Buchholz, L. Steinert, et. al.
Mark I Owners - TRC Representatives EPRI - C. Sullivan, et. al.
LLL - E. McCauley, et. al.
AL.
im>A C. Grimes Task Manager A-7
Enclosure:
As stated cc: see page 2 7 9 012 5 0 N o
~
s s
4 4
7'.... _.
.e
~
6/d; PROPOSED AGENDA January 22, 1979 2:00 - 7r00 pm Discussion of two and three dimensional pool swell test results 1.
20/3D data comparisons 2.
three dimensional effects
- 3..
test facility configurational differences 4.
effects of vent system orificing 5.
vent flow distributions 6.
pressure integration methodology
~
January 23, 1979 I.
General Program Status Summary 1.
Schedule for submittal of outstanding reports.
2.
Implementation of LDR and plant-unique, analysis content.
3.
Methods for resolution of NRC questions and comments.
II. Ongoing program issues l.
Downcomer submergence -thermal stratification 2.
FSTF application methodology 3.
Fluid - structure interaction effects 4.
Load definition error and uncertainty III.
SRV Discharge Loads s
1.
Quencher parametric testing
- a. 1/4 scale test results
- b. scaling considerations (NEDC 23713) 2.
Monticello quencher test results 3.
Bubble phasing 4.
Pool temperature limits for quencher 5.
Monticello mixing test results.
IV. Detailed discussion of NRC/ consultant questions and comments on Mark I Load Definition Report (NEDO 21888).
January 24, 1978 Continuation of NRC/ consultant questions and comments on Mark I Load Definition Report.
~
'k
~
4 s
w w
. DISTRIBUTION:
H. Centon dgc pod V. Stello Local POR B. Grimes Docket Files T. Carter OELD 50-10 OI&E (3) 50-219 ACRS (16) 50-247 OSD (3) 50-259/260/269 D. Eisenhut 50-324/325 G. Lainas 50-298 G. Knighton 50-249 V..
Noonan 50-331 P. Check
( Cn N D. Ziemann 50-321
- f. Ippolito 50-366 D. Davis 50-253 J. Stolz 50-220 R. Baer 50-293 R. Hartfield 50-277/278 D. Thompson 50-254/265 R. Tedesco 50-271 W. Butler 50-341 F. Schauer 50-354/355 J. Knight C. Anderson S. Fabic R. Cudlin N. Su R. Bosnak K. Wichman J. Fair C. Grimes H. Shaw
~