ML19289C801
| ML19289C801 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/08/1979 |
| From: | Charemagne Grimes Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7901250206 | |
| Download: ML19289C801 (4) | |
Text
e J
,g
- p, UNITED ST ATES y%
NUCLEAR REGULATORY COMMISSION
{,jU2 j
WASHINGTON O. C. 20555
\\ 8 /,/
JAN 8 1979 MEMORANDUM FOR:
D. G. Eisenhut, Acting Assistant Director for Systems and Projects, Division of Operating Reac'. ors FROM:
C. I. Grimes, Task Manager A-7
SUBJECT:
FORTHCOMING MEETING WITH REPRESE!!TATIVES OF THE MARK I OWNERS GROUP DATE & TIME Monday, January 22, 1979 2:00 pm Tuesday, January 23, 1979 8:30 am Wadnesday, January 24, 1979 8:30 am LOCATION:
San Jose, CA 1/22/79 GE Pruneyard Towers ~
1/23-24/79 Hyatt House PURPOSE:
To discuss the Mark I Long Term Program Load Defirition Report and related issues. A pro-posed agenda is attached.
ATTENDEES:
NRC - C. Grimes, J. Fair, J. Kudrick, N. Su BNL - G. Maise, J. Ranlet, R. Kosson, C. Tung, C. Economos, A. Sonin (MIT), G. Bienkowski (Princeton)
GE - B. Buchholz, L. Steinert, et. al.
Mark I Owners - TRC Representatives EPRI - C. Sullivan, et. al.
LLL - E. McCauley, et. al.
b3MA -
C. Grimes Task Manager A-7
Enclosure:
As stated cc: see page 2
~
7 901250 M6
4
-2 DISTRIBUTION:
H. Denton (Q
V. Stello Local POR B. Grimes Docket Files T. Carter OELD 50-10 01&E (3) 50-219 ACRS (16) 50-247 OSD (3) 50-259/260/269 D. Eisenhut 50-324/325 G. Lainas 50-298 G. Knighton 50-249 V. Noonan 50-331 P. Check 50-333 D. Ziemann 50-321 T. Ippolito 50-366 D. Davis 50-253 J. Stolz c -220 R. Baer s R. Hartfield 50-2,'f278 D. Thompson 50-25*/'65 R. Tedesco 50-271 W. Butler 50-341 F. Schauer 50-354/355 J. Knight C. Anderson S. Fabic R. Cudlin N. Su R. Bosnak K. Wichman J. Fair C. Grimes H. E ~
A PROPOSED AGENDA January 22, 1979 2:00 - 7 :00 pm Discussion of two and three dimensional pool swell test results 1.
2D/3D data comparisons 2.
three dimensional effects 3.
test facility configurational differences 4.
effects of vent system orificing 5.
vent flow distributions 6.
pressure integration methodology January 23, 1979 I.
General Pr ogram Status Summary 1.
Schedule for submittal of outstanding reports.
2.
Implementation of LDR and plant-unique, analysis content.
3.
Methods for resolution of NRC questions and comments.
.I.
Ongoing program issues 1.
Downcomer submergence -thermal st-
.fication 2.
FSTF application methodology 3.
Fluid - structure interaction effects 4.
Load definition error and uncertainty III. SRV Discharge Loads 1.
Quencher parametric testing
- a. 1/4 scale test results
- b. scaling considerations (NEDC 23713) 2.
Monticello quencher test results 3.
Bubble phasing 4
Pool temperature limits for quencher 5.
Monticello mixing test results.
IV. Detailed discussion of NRC/ consultant questions and comments on Mark I Load Definition Report (NEDO 21888).
January 24, 1978 Continuation of NRC/ consultant questions and comments on Mark I Load Definition Report.
-