15.1118 YL.4 NE9 1*0 WEIT C001*Eit.t TI YE Ea l'ione, Olhcomin 54601 January 16, 1979 In reply, please refer to LAC-6072 DOCKET NO. 50-409 Mr. James G.
Keppler Regional Director U.
S.
Duclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 REPORTABLE OCCURRENCE NO. 79-02 Feference:
(1)
LACBWR Technical Specifications, Section 3. 9. 2.a. (3).
(2)
LACBWR Technical Specifications, Section 5.2.1.2.(B)4.
Dear Mr. Keppler:
In accordance uith Reference 1, this is to inform you of abnormal degradation discovered in the primary reactor containment during periodic Type B and C surveillance leakage rate testing.
As a result of conducting periodic Type B leak tests on electrical penetrations, the leak flow rates determined from electrica] pene-tration Nos.
3, 4 and 6 exceeded the permissible leak flow rates as defined in Technical Specifications, Section 5. 2.1. 2 (b) 4.
The test leakage rates were determined to be 0.412 SCFH on No.
3, 8.27 SCPH on No. 4 and 0.619 SCFH on No.
6.
The Acceptance Criteria is 0.375 SCFH.*
The tests were performed on January 15, 1979.
Prompt notification of test results to Mr. Ken Ridgway of the U.
S. Nuclear Regulatory Commission Region III was accomplished at 0949 on January 16, 1979 by John D.
Parkyn, LACBWR Assistant Superintendent.
- Shall not exceed 1% of leakage rate L where L is 37.5 SCFH.
po po
_ 1_
790122o084
LAC-6072
?Ir. Jamec G.
Keppler January 16, 1979 Regional Director Repairs to the electrical penetrationo are being accomplished and retests will be performed.
If there are any questions concerning this report, please contcct us.
Very truly yours, DAIRYLAND PONER COOPERATIVE Frank Linder, General Manager FL:af Director, Of fice of Management Information and (3) cc:
Program Control U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 2-
-