ML19289C514

From kanterella
Jump to navigation Jump to search
Informs GE Rept NEDO-21888, Mark I Containment Program Load-Definition Rept Was Transmitted to NRC W/Lj Sobon & Should Be Included in Facility Docket
ML19289C514
Person / Time
Site: Pilgrim
Issue date: 01/09/1979
From: Andognini G
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
79-25, NUDOCS 7901170225
Download: ML19289C514 (1)


Text

BOSTON EolsDN COMPANY GENERAL OFFICES 800 BOYLSTON STREET B O E TO N. M Ass ACHUEETTs 02199 G. CARL ANDOGNINI MANAGER NUCLEAR OPERATION 5 DEPARTMENT January 9, 1979 BECo. Ltr. #79-25 Mr. Thomas is. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 lbrk I Containment Program General Electric Report NEDO-21888,

" Mark I Containment Program-Load Definition Report"

Dear Sir:

The subject report has been transmitted to thc. Nuclear Regulatory Commission by General Electric Co. via Mr. L. J. Sobon's letter to Mr. V.

Stello, dated December 28, 1978. This report provides information required to define the hydrodynamic loads produced on the containment system of domestic Mark I plants dt. ring postulated loss-of-coolant-accidents, safety / relief valve discharges, and related dynamic events. The report NEDO-21888 should be in-cluded on the Pilgrim Nuclear Power Station docket.

Very truly yours,

/ j "e'o'

.W!#*

"6 0

\\

7901170AAS p