ML19289A059

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution Mod 3 to Determination of Correct Form for Correlation of the Tong F-Factor, Ga Inst of Technology
ML19289A059
Person / Time
Issue date: 10/20/1978
From: Menczer W
NRC OFFICE OF ADMINISTRATION (ADM)
To:
Shared Package
ML19289A060 List:
References
CON-NRC-03-78-670, CON-NRC-3-78-670 NUDOCS 7901040311
Download: ML19289A059 (1)


Text

-

r d'

'\\_

CON 1 H ACT NUMBf F1 NRC i oHQ255 (10 76#

HRC-03-78-570 DIV!FION OF CONT R ACTS MODIFIC AllON NUMBE R U.S NUCLi Art R[GUL A TOftY CGMMISSION Thpgg(3)

W ASHING T ON, D.C.

20%b L l N[ W IK MODIF IC AliON O T H E n (Sin c.tv)

NOTIFICATION OF CONTRACT EXECUTION

"^

"^

Roger J. !!Cttson, Director T r' ' --

AUTHORIZ ATION NUMDL R MRA-78-670 dated 10/f0/78 Division of Systems Safety oATE tom.~.,r wa y

gy

' " ' " ^ ' ' ' " ^ " " " " ' " ' " ^ ' " "

viiltan a. nenczer

<co.a me s,,u,.,mri toer,o Extends period of performance through January 15,21Et 197s at no additional cost to the Technical Assistance Contracts Branch Government.

nivlSION Of CON TR ACTS, ADM CON 1 H ACIOH IVom & L oon in)

E XECUTION ()AT E Georgia Institute of Technology Atlanta. Georgia TYPE OF CONTR ACT Cost Retaborsenen l'HOJt C T 111 L L PE RiOD OF PE RFORM ANCE 9/29/7s - 1/15/79 Seterailnation of Correct Tom for Correlation of the Tong F-ractor PniNCiPAt iNvEsuc ATOn Lynn E. Weaver NRC AUTHORIZE D RE PRESENTATIVE Zoltan R. Pesztoczy 59 F IN NUMBE H 26IOt UMHL R03-01-1 D6460 AMOUNT NEW NRC FUNDS s

0 FUNDING TOT AL FY 7_. FUNDING s IO*0l2 0

TOTAL NRC OBLIGATIONS s 16,812 60VE HNMI N i PitOPf.R t Y AT TACHMENT(S):

9 010 40 5 t(

  • 1"**%$rDE@

.o N/A CONTH ACT DOCUMENT I

)

[j""7l;i ACCESSION UNIT, RECORDS FACILITIES BRANCH, DDC 9

"""2"