OPERATING DATA REFORT

~

50-409 l

DOCKET NO.

DATE 01-07-79 COMPLETED BY L.G.Papworth TELEPHONE 6tni-689-2331

~

OPFRAT!?.T, STATUS La Crosse Boilino Water Reactor Notes

1. Unit Nanne.
2. % Period. 0000 79-01-02 to 2400 79-28-02 165
3. I h=d Thmmal Ptmer (HWt):
4. Nmsnegats Ildag (Grcss MWe):

65.3 50

5. Desips Cectrimi Rattag(Net MWe):

50

6. Muheats WW Crpsc!!y(Gross MWe):

00

7. Muhnusa Depr w*-Me Cepacity (Net MWe):
8. If Changes Occur in Capacity Rath;s (!!:ms Number 3 Through 7) Since Last Repert. Ghe Re: sons:

i 48 Net MVe

9. Power tent To Mih IL-s:ricted.If Any (Net MWe):

SELF-lMPOSED RESTRICTION DUE TO NUCLEAR INSTRUMENTATION

10. Ressoas For Restdedocs.U Any.

NOISE AT HIGHER POWER LEVELS (VOIDS IN STEAM SEPARATORS).

This Month Yr..:o-Date Cucchthe 672 1,416 81,771 II. Hours!n Reportha Period

12. Ncmber Of fleurs Ecuter W Critica!

672 1.177.8 52.357

13. Dewe= R:Erve Shusdosca!!aisrs 0

0 478 14; Ecurs Gaars:orOnLins i

s..

672 1.110,5 47.328.6

!$. Uutt Esserse ShusdowsI!=cus 0

0 79

16. Cseas Thansal Earrgy Canented (umI) 55,006 89,737 6,626,979
17. Gsees Elessaical Ensegy Geses:ved (MWH) 15.338_

25.110 2.007.419 r

14,104 22,804 1,854,607

13. p sW EmerEy Gescrzted(MMI)
19. Ualt Seselse Fester.

100 78.4 58.5 100 78.4 58.6

,.20. Unit AvaAmb5ty Facter, 420 Unit Capacity Facter (Ustag MDC Net) -

43.7 33.6

_47.3

['

42.0 32.2 45.4 t

22. Unis capac! y Factor (Using DER Net) 0 21.6 6.0
23. Uus Forced ovens, man.

I 387 Shattenes $dedded OEur Mext 6 %* (Type.Date,and Dusados of Er.ch3:

,["REFUELINGSHUTDOWN,'HARCH 24, 1979, 8-WEEK DURATION.

w s

r MN b g,9%, Fh+i t.

E'+**

'T C %

1),

.p,

.to#

t.

4 25.-If met Doon As Esd Of Sepset Prr'ad.Estlenesed Date cf Sesstup:

t

26. Uelas la Tsar seseas (Prior se Commeretal Oyeestion):

Fasecas Achmed

- INITIAL CRITICAR.JTY INJTIAL ELECTRICITY COMMERCIAL OPERATION c.-,

7003150)Jf:

i i

AVERAGE DAILY UNIT POWER LEVEL I

50-409 DOCKET NO.

~-

LACBWR WIT 03-07-79 DAR L.G.Papworth COMPLETED DY 608-689-2331 TELEPl!ONE MONTH FEBRUARY 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) ogwe. Net)

I 21 21 37 2

21 21 g3 21 21 3

39 4

21 21 20 5

21 21 21 21 21 6

22 21 21 7

23 8

21 21 24 9

2I 21 25 10 21 21 26 11 21 21-27 12 21 21 3

21 13 29 21 14 30 21 15 3

2I 16 s

INSTRUCITONS On this format list the average daily unit power level in MWe-Net for each day in the reporting rmmth. Compute to the ocarest whole rnegawatt.

(9/77)

e i

s

/

7 N

7 SF

)

SF c

o hr ec de ud led 1

8 8

t

%I-.

5 7

2 lGFEDCBAR

  • h-y l

- - - - - - e eoAORRMEa n

tp dp e e a q s fiu o hemeg er r u unin r aialetp; nt aler (t iiot nnn

$E2C i

Eos t r o ae xnr rg nn

EEe, p a a Ty ct llt r i

e a

aF F

iEvi nr ene oa

)r I s

^fi l

o nt u

r g

Tr r

r i

e e E$E e

&c

(

i s

t t(

E o

E x

Un x

pl c

pl ai e

j. g Y c

n a

n

)

e ni

set U

s 5

)

o N

5g EaEu-E t

I x

T a

S m

R H

in U

a EP T

t i

R L

O D

o Eci R

O e

n p s e

roe n T

W i nt e M

N s

=

c S

ON A

T N

i D

3 l

P O

F 4321 M J a c..

e W

/

OAMMe G7t b

E t

t ua ah r

R ht nno e o uud u

R r m a a.-

a E

(

l l Ea r

D S

Y t

xi c U

jEd,k c

p l

r C

aSa 1

Ll 9

T i c m.

nr I

a 7

O

)

m.

9 N

S 5

4 CO P

C E

0EFfE e

a T M D

r o

v u

E P U O i

1 va x

h 6ei h

nae L L N C r

e s

E I

n >r Pi t c4 PT TK b

E i

1 b

t r

i

)

ei t

E RSpt RioC H E DN T t

ehaG e

S ot t ut r O D AA N i

c no per NBTM a

r r oe EYEE.O r siI r

a i

on e

c m

fns n

t I

o e

Lr c

h t

ar e

e 6

I 0

L 5

S ELfu 0_

1 A

0 c

o RiDti 8

C C

c u

) eao 0

B 4

rc Fnt n 6

P 7 W 0 e

lis a s e

8 n

R 9 e e

(

9 n

7 R

- e N

9 U

2 r

1 1

t E

1 h

G s

a

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE FEBRUARY 1979 At the onset of the February reporting period, power generation was continuing at a reduced output of 21 MWe-net (49% reactor rated thermal power).

Operation at this reduced level was due to the necessary securing of the 1A Forced Circulation Pump in January 1979 due to indications of excessive face seal wear.

Forced Circulation Pump 1B was providing core recirculation flow.

Operation continued at this power level for the remainder of the month.

The reoccuring Forced Circulation Pump 1A Seal problem hac F3en analyzed.

Improvements have been obtained in seal parts and repairs will be effected during the forthcoming refueling outage which is to ccmmence in late March 1979.

The maximum power level at which the reactor was operated during February 1979 was 49% of rated thermal power and the maximum not electrical generated power was 21 MWe-net.

The off-gas activity levels, as measured at the 150 ft3 holdup tank effluent monitor (prior to entry into the augmented off-gas holdup system) did not exceed 285 curies / day during February 1979 and the alpha activity in the primary coolant did not exceed 9.5 x 107 pCi/gm during the reporting period.

These valves are considerably below the Tecnnical Specification limits.

Signific.

. maintenance items performed during the reporting period a;e indicated on attached Instrument and Electrical Maintenance and Mechanical Maintenance listings.

O

FEBRUARY 1579 INSTRUMENT AND ELECTpICAL YAINTENANCE LER OR NATUPE OF OUTAGE MALFUNCTION EQUIrMENT MAINTENANCE NUMBER CAUSE RESULT CCRRECTIVE ACTION Heating and Ventilation Corrective NA Defective Contactg incorrect Print-Cleaned and adjusted System MR 2461 I out recording switch, l

l l

Heating and Ventilation Corrective NA Burned Out Con-Inoperative Space Replaced Control System MR 2248 trol Transformer Heater Transformer Radiation Monitoring, Preventive NA Motor Cleaning Cc pleted PM Cleaned Drive Motor i Mobile Air Monitor PM Work Due Component Cooling Water Facility Change NA Equipment Relo-Completed Relo-Completed Facility Change Flow Indicator 78-07 cation cation i

I Turbine Expansion Corrective NA Defective Rotary Incorrect Print-Replaced Solenoid Switch Recorder MR 2476 Solenoid Switch out MR 2478 MR 2480 1

l Demineralizer Water Preventive NA Motor Cleaning Completed PM Replaced Bearings and

Pumps IA and IB PM Work Due Cleaned Motor Ii Motor Operated Valves Preventive NA NRC Inspection inspected Equip-None.

Equipment Satis-I IE Bulletin 79-03 Bulletin ment as per factory.

Bulletin l Hecting and Ventilation Corrective NA Defective Automatic Boller Replaced Programmer l System MR 2484 Programmer Shutdown Hydrogen Analyzer Corrective NA Defective IC No Ready Light Replaced IC and Tested 1

MR 2482 Unit

}

}

fiECIIANICAL MAINTENANCE FEERUARY 1979 LER OP NATURE OF OUTAGE MALFUitCTION EQUIPMENT P.AINTENANCE

;MBER CAUSE RESULT CORRECTIVE ACTION "A" Demineralized Water Corrective NA Indefinite Bearings failed.

Replaced bearings.

Transfer Pump MR 2465 "A" Containment Building Corrective NA Metal Fatigue Blower shaft broke, Rebuilt blower, replaced Air Conditioner - West MR 2407 (Probable) bearings failed.

damaged expansion valve, Blower recharged unit.

Gas Storage Tanks' Corrective NA Steam Trap Lost heat in Rebuilt trap; installed Vault Unit Heater MR 2463 Plugged with vault; off-gas temporary heat tracing to Rust and Scale.

lines blocked by thaw piping.

freezing conden-sate.