U.S. flVCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.
99900269/78-02 Program No.
51300 Company:
The William Powell Company Plant No. I 2503 Spring Grove Avenue Cincinnati, Ohio 45214 Inspection Conducted:
December 18-21, 1978 Inspectors: I N-W
//s/v7
[ R. E. Oller, Contractor Inspector, Vendor Date Inspection Branch Approved by:
O"N
/M /71 g D. M. Hunnicutt, Chief, Components Section 11 Date Vendor Inspection Branch Summary Inspection on Decemoer 18-21, 1978 (99900269/78-02).
Areas Inspected:
Implementation of 10 CFR 50 Appendix B, other NRC requirements and applicable codes and standards including internal audits, special welding, testing of completed products, procurement product acceptance, and action on previous inspection findings. The inspection involved 22 inspector-hours on site.
Results:
In the five (5) areas inspected, no deviations or unresolved items were identified.
7903150191
. DETAILS SECTION (Prepared by R. E. Oller)
A.
Persons Contacted J. Fassel, Production Expeditor
- S. Fogle, Manager of Laboratory
- E. Hoeffer, QA Manager, Plant 1 M. Kruse, QC Coordinator F. Payen, Gage Inspector M. Reddin, Receiving Inspector G. Sarandos, QC Inspector R. Schneider, Welding Engineer C. Johnson, Welding Supervisor
- J. Williams, Project QA Engineer
- E.Winterfeldt, Corporate QA Manager
- Attended the Exit Meeting.
B.
Action on Previous Inspection Findings 1.
(Closed) Deviation No. A (Report No. 78-01):
Failure to provide the ASME Class 1 acceptance criteria specifications for use with NDE procedures No. WPNT-100 and No. WPNT-200 for use at plant No. 1.
The inspector found that approved ASME Class I acceptance criteria specifications flo. WPNT-150-AC0-1 and No.
250-AC0-1 for use with the above procedures, are now available at Plant No.1 2.
(Closed) Deviation No. B (Report No. 78-01):
Failure to cali-brate the contact surface pyrometer SN N-13442, used in measu -
ing the welding preheat and interpass temperatures. The inspector found that the subject device was calibrated on July 19, 1978, by Service Tectonics, Inc. and their certificate of calibration is on file at plant No.l.
In addition, this device has been included in the calibration program recall file system.
3.
(Closed) Deviation No. C (Report No. 78-01):
Failure to provide a subcontractor's statement or certificate delineating calibra-tion details and data for prior calibrations of the Lucifer postweld stress relief furnace and failure to have the required heat uniformity survey performed on this furnace. The inspector found that the subject furnace was surveyed and calibrated in July 1978, and the documentation for the temperature uniformity survey and calibration are available at Plant No. 1.
In addi-tion, this furnace has been included in the calibration recall file system.
. 4.
(Closed) Unresolved Item (Report No. 78-01):
Failure to have all of the new corporate NDE procedures issued for use at Plant No. I accepted by the Authorized Nuclear Inspector.
The inspec-tor found that the AMIS at both Plants No. 1 and No. 2 had issued memorandums dated June 5, 1978, and June 2, 1978, res-pectively, verifying that all new procedures for use at Plant No. I had been reviewed and accepted by them.
C.
Internal Audits 1.
Objectives The objectives of this area of the inspection were to verify that the following items were controlled in accordance with applicable NRC and ASME code requirements:
a.
A written system has been established to assure that inter-nal audits are performed and controlled in accordance with applicable codes to verify compliance with all aspects of the QA program.
b.
Planned and periodic internal audits are performed in accordance with written procedures or checklists by quali-fied personnel not having direct reponsibilities in the areas being audited.
c.
Audit results are documented and reviewed by management having responsibility in the area audited.
d.
Follow-up action, including reaudit of deficient areas, is taken where indicated.
2.
Method of Accomplishment The preceding objectives were accomplished by:
a.
Review of the QA Manual Article II, paragraph 11.1 " Internal Audits."
b.
Review of the Plant No. 1 "1978-1979, Nuclear Audit Plan" including the internal audit outline to verify that ade-quate instructions and requirements for the performance of audits are documented.
c.
Review of reports of internal audits for the period of January 1978, through December 1978, to verify that:
. (1) The audits were planned and performed on a periodic basis using detailed checklists by qualified personnel.
(2) The auditors did not have direct responsibilities in the areas audited.
(3) The audit results were documented and reviewed by management of the areas audited.
(4) Follow-up action, including reaudit of deficient areas, was taken where indicated.
d.
Discussions with cognizant personnel.
3.
Findings Within this area of the inspection, no deviations or unresolved items were identified.
D.
Special Welding 1.
Objectives The objectives of this area of the inspection were to verify that the following items were controlled in accordance with applicable NRC and ASME Code requirements.
a.
A written system has been established to assure that special welding applications, such as hardfacing, are performed and controlled in accordance with applicable codes.
b.
The documented welding procedure specifications used are suitably qualified and are in accordance with the ASME Code for the specific special applications.
c.
The welders are qualifie,. as required.
d.
The welding results are documented and accepted.
2.
Method of Accomolishment The preceding objectives were accomplished by:
a.
Review of the QA Manual, Article 5, paragraph 5.4 " Welding."
b.
Review of the Production Router traveler for Order No. 254079, Inspection Code No. 4006, for the operation of hardfacing of
. a lh inch valve body seat to verify that the stelliting operation was controlled and identified on the traveler by procedure and revision numbers WP-167, Revision 9.
c.
Review of the in-process welding procedure specification (WPS) No. WP-167, Revision 9, " Welding Pro dure - Hard-facing, ASME Section III..." for the above traveler operation; the related procedure qualification record (PQR) and the performance qualification dated September 27, 1972, for welder HW, to verify that the required WPS was being used; that the WPS was approved and qualified, and that the welder was properly qualified.
d.
Observation of in-process manual hardfacing of the above (Item 2.b.) valve body seat using WPS WP-167, Revision 9, to verify that the procedure's essential variables and other parameters were being complied with.
e.
Observation of the calibration status of welding equipment such as the welding machine, the Argon gas flowmeter, and the surface contact pyrometer to verify that this equipment was calibrated as required by the QA program.
f.
Review of the " Welding Operation Record" sheet and the traveler after completion of the welding to verify that this activity was properly recorded.
g.
Discussions with cognizant personnel.
3.
Findings Within this area of the inspection, no deviations or unresolved items were identified.
E.
Testing of Comoleted Products 1.
Objectives The objectives of this area of the inspection were to verify that the following items were controlled in accordance with the appli-cable NRC and ASME Code requirements.
a.
A written system has been established to assure that final pressure tests are controlled in accordance with applicable procedures, specifications, and codes.
b.
Final pressure tests are performed in accordance with approved procedures, instructions or specifications.
. c.
The results of tests are documented and reviewed for ac-ceptability.
d.
The test equipment is calibrated where required.
e.
The tests are performed by qualified personnel.
2.
Method of Accomplishment The preceding objectives were accomplished by:
Review of the QA Manual Article 6, paragraph 6.3 " Assembly, a.
Test, and Final Inspection."
b.
Review of approved hydrostatic test procedure No. UPTS-240, Revision 2, to verify that this procedure (used for shell pressure test and seat leakage test of valves) prescribed a system for these tests which was consistent with the commitments of the QA program, c.
Observation of a hydrostatic shell test and of a seat leak-age test of a lis", 300 lb., T316SS Swing Check Valve SN-288270-1-7, and review of the completed controlling assembly router traveler and test record Form EXP-1 dated December 20, 1978, all to verify that these activities were controlled; witnessed by the ANI. and the manufacturer's representative, and that the test results were properly recorded.
d.
Observation of the calibration status of the pressure gage used for the tests to verify that it was calibrated as required.
e.
Review of records of shell hydrostatic and seat leakage tests for four (4) completed valves, serial numbers 284467-10-1,
-2,
-3, and -4, to verify that the test reports were properly completed and signed by responsible personnel.
f.
Discussions with cognizant personnel.
3.
Findings Within this area of the inspection, no deviations or unresolved items were identified.
F.
Procurement Product Acceotance
_7_
1.
Objectives The objectives of this area of the inspection were to verify that the following items were controlled in accordance with applicable NRC and ASME Code requirements.
A written system has been established to assure that prc-a.
duct acceptance activities related to procurement of items are controlled.
b.
Procedures have been prepared, approved and implemented by responsible personnel to control the subject activities.
c.
The results of product acceptance activities are documented and reviewed for acceptability by responsible personnel.
2.
Method of Accomolishment a.
Review of the QA Manual Article 4, " Material Procurement and Control."
b.
Discussions with the receiving inspector relative to re-ceiving inspection activities.
c.
Review of receiving inspection documents completed or_used by the receiving inspector, such as Receiving Inspect'or Record Reports, Material Releases, Trouble Analysis Reports, Process Router and Critical Dimension Drawing CM-66908A, all common to 53 valve body castings Instection Ccde Numbers 4919 through 4971 for Powell Order No. 296316, all to verify that the receiving inspection activiti s for these purchased items are conducted in accordance with the QA program.
d.
Review of certified Material Test Reports for.the three (3) heats of material representing the above 53 castings,
.to verify that the responsible QA personnel reviewed and accepted these CMTRs.
e.
Discussions with other cognizant personnel.
3.
Findinas Within this area of the inspection, no deviations or unresolved items were identified.
G.
Exit Interview 1.
The inspector met with management representatives denoted in paragraph A at the conclusion of the inspection on December 21, 1978.
. 2.
The following subjects were discussed:
a.
Areas inspected.
b.
Status of corrective and preventive actions for the pre-viously identified deviations and the unresolved item.
c.
The absence of deviations and unresolved items in the areas inspected.
3.