ML19284A463

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 781128-29 & 1205-06
ML19284A463
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 01/09/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19284A461 List:
References
50-306-78-21, NUDOCS 7903060505
Download: ML19284A463 (1)


Text

.

Appendix A ll)

NOTICE OF VIOLATION Northtrn States Power Docket No. 50-306 Company Based on the results of the NRC inspection con (acted on November 28 and 29, December 5 and 6,1978, it appears that certain of your activities were not conducted in full compliance with NRC require-ments as noted below.

The item below is a deficiency.

10 CFR Part 50, Appendix B, Criteria IX, states in part that " Measures shall be established to assure that special processes including welding.

. and nondestructive testing.

. are controlled ar.d accom-plished.

.with... applicable specifications.

.and other special requirements.

The Prairie Island Nuclear Generating Plant FSAR, Section 1.8 commits to 10 CFR Part 50, Appendix B.

a.

Paragraph 8.6.4 SNT-TC-1A, 1975 Edition requires that a com-posite grade of 90% is necessary to pass the test.

Contrary to the above, Lambert, MacGill, Thomas, Inc. procedure No. QA-6, Revision 6, " Qualification and Certification of NDE Personnel", >brch 6,1978, did not state that for NDE Level III personnel, a composite grade of 90% is required to pass the test.

b.

Lambert, FbcGill, Thomas, Inc. Procedure No. QA-6, Revision 6, March '

1978, " Qualification and Certification of NDE Personnel,"

SNT-TC-1A, 1975 Edition, requires experience prior to taking an examination for any NDE method.

Contrary to the above, two NDE personnel certifications received did not document previous NDE experience.

79030605o6